KC-10 Roadmap<br />

Modification Explanations<br />

Defensive Systems<br />

A system to protect the KC-10 from infrared and radio frequency threats to reduce vulnerability<br />

from hostile systems is required. <strong>The</strong> plan is to provide a growth path for this capability in the initial<br />

KC-10 AMP increment, with installation in the future as funding becomes available. Baseline<br />

capability will be the requirements outlined in the Large <strong>Air</strong>craft Infrared Countermeasures (LAIRCM)<br />

ORD and Advanced Situational Awareness and Countermeasures (ASACM) CDD.<br />

(b)(5)<br />

GATM Stop Gap<br />

<strong>The</strong> original GATM solution for the KC-10 installed the minimum equipment required to comply<br />

with near-term CNS/ATM requirements. Original cost estimates did not take into account the<br />

additional effort required to integrate the new (digital) equipment with the old (analog) cockpit. This<br />

technological challenge significantly increased the original cost for KC-10 GATM and made the<br />

original GATM program underfunded, unique in design, and inadequate for future requirements of<br />

the KC-10. As a result, KC-10 GATM was terminated in April 2004. <strong>The</strong> stop-gap effort supported<br />

several projects with remaining GATM funds which bridged from the terminated KC-10 GATM<br />

program to the KC-10 AMP program. <strong>The</strong> stop-gap matrix below (present to FY09) will address the<br />

following capabilities:<br />

KC-10 Stop-Gap Matrix:<br />

Description AMC OPR Need Date Funding Requirements Project<br />

Document <strong>Plan</strong><br />

GATM AC Restoration A5QT Completed Funded Stop Gap X<br />

Enhanced Mode S A5QS FY09 Funded GATM ORD X<br />

Restore FTD #1 A3TK Completed Funded Stop Gap X<br />

Restore FTD #2 A3TK Completed Funded Stop Gap X<br />

PRNAV Cert A5QT Completed Funded Stop Gap X<br />

Iridium Phone Ant A5QT ASAP Funded 1067 X<br />

UHF SATCOM Ant A3DT ASAP Funded 1067 X<br />

Courseware A3TK FY09 Funded Stop Gap X<br />

KC-10 AMP<br />

HQ AMC, the KC-10 Program Office, and <strong>Air</strong> Staff representatives conducted a benefit/cost analysis<br />

which recommended a competitive acquisition strategy for the KC-10 AMP. AMP was more than<br />

an avionics upgrade; it included Joint Requirement Oversight Council (JROC)-validated capabilities<br />

beyond an avionics upgrade. <strong>Air</strong> Refueling Initial Capabilities Document (ICD) supports both<br />

KC-10 AMP and KC-X and was JROC-approved 30 November 2004. KC-10 AMP CDD was JROC<br />

approved and key performance parameters (KPP) validated on 2 June 2006. <strong>The</strong> KC-10 AMP CDD<br />