path (life expectancy estimated to 2040). Following a comprehensive business case analysis, the<br />

AMC Commander approved the termination of the KC-10 GATM program and directed the initiation<br />

of KC-10 <strong>Air</strong>craft Modernization Program (AMP). This program addressed providing net-centric<br />

communications, enhanced survivability, capabilities to meet CNS/ATM, survivability, and force<br />

protection requirements, as well as improvements in the aircraft’s reliability and maintainability.<br />

Due to affordability issues, KC-10 AMP was descoped with CNS/ATM addressed under the<br />

KC-10 AEP and the remaining capabilities addressed under stand-alone capabilities development<br />

documents (CDDs).<br />

More efforts are planned to ensure the KC-10 can provide the required mission capabilities. Defensive<br />

systems are required to ensure missions performed in hostile infrared (IR) and radio frequency (RF)<br />

threat environments can be performed. With the widespread use of night vision devices, KC-10s<br />

need to be modified with NVD-compatible interior<br />

and external lighting. <strong>The</strong> proliferation of weapons of<br />

mass destruction drives the need to conduct operations<br />

following the employment of chemical and biological<br />

weapons (see <strong>2008</strong> C-CBRN Roadmap).<br />

• First Flight: 1979<br />

• First Operational <strong>Air</strong>craft Delivered: 1981<br />

• Last Operational <strong>Air</strong>craft Delivered: 1990<br />

• Average Age of Fleet: 22 years<br />

• Range (Unrefueled): More than 11,500 miles<br />

• Crew Ratio: Active, 2.0; Associate Reserve, 1.5<br />

Key Capability Improvements<br />

Numerous capability improvement programs are ongoing or planned for the KC-10 fleet with HQ<br />

AMC priorities identified by the Requirements and <strong>Plan</strong>ning Council Process.<br />

KC-10 Roadmap<br />

(b)(5)<br />

FOR OFFICIAL USE ONLY (FOUO)<br />

OCT 07 73