05.08.2014 Views

Solenoid-Diaphragm Dosing Pump

Solenoid-Diaphragm Dosing Pump

Solenoid-Diaphragm Dosing Pump

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Solenoid</strong>-<strong>Diaphragm</strong> <strong>Dosing</strong> <strong>Pump</strong> MAGDOS LP<br />

Operating Instructions<br />

8.7.7 Priming aid<br />

Priming aids are particularly advisable:<br />

• in the case of dosing pumps with small volumetric displacements<br />

per stroke or with low stroke length settings,<br />

• with high uction heads,<br />

• with highly dense dosing media,<br />

• at priming for the first time due to dry valves and air in the suction<br />

line and the dosing head,<br />

• in dosing systems with frequent downtimes.<br />

Further advantages resulting from priming aids:<br />

• preventing cavitation in the suction line,<br />

• gas removal,<br />

• optical dosing control with small amounts,<br />

• smoothing of the suction flow.<br />

No.<br />

<br />

<br />

Table 8-5:<br />

Chemical tank<br />

Suction line<br />

Designation of components<br />

8.7.8 Level monitoring<br />

Level monitoring of suction-side feeding of the dosing medium to<br />

prevent the tank being sucked dry and to ensure that it can be topped<br />

up again in good time.<br />

<br />

Description<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Fig. 8-16: Installation with a level monitoring system<br />

No.<br />

Description<br />

Fig. 8-15: Installation with a priming aid<br />

<br />

Main line<br />

No.<br />

Description<br />

<br />

Injection nozzle with shut-off valve<br />

<br />

Main line<br />

<br />

Pressure line<br />

<br />

Injection nozzle with shut-off valve<br />

<br />

MAGDOS LP dosing pump<br />

<br />

Priming aid<br />

<br />

Chemical tank<br />

<br />

<br />

MAGDOS LP dosing pump<br />

Wall bracket<br />

<br />

Table 8-6:<br />

Suction line with level monitoring<br />

Designation of components<br />

Table 8-5:<br />

Designation of components<br />

© Lutz-Jesco GmbH 2012<br />

Subject to technical changes.<br />

BA-10231-02-V01<br />

Hydraulic installation<br />

Hydraulic accessories<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!