08.09.2014 Views

TM 3-4240-313-10 OPERATOR'S MANUAL SIMPLIFIED ...

TM 3-4240-313-10 OPERATOR'S MANUAL SIMPLIFIED ...

TM 3-4240-313-10 OPERATOR'S MANUAL SIMPLIFIED ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TM</strong> 3-<strong>4240</strong>-<strong>313</strong>-<strong>10</strong><br />

(3) Remove furnishings and debris which will interfere with deployment of SCPE.<br />

NOTE<br />

If selected room has windows, refer to your unit Standing Operating Procedures (SOP) or your<br />

supervisor for blackout procedure before continuing.<br />

Wipe dusty surfaces with dry rag (Item<strong>10</strong>, App D) before applying tape.<br />

(4) Using tape from accessory package, seal windows, pad sharp objects and overhead lights.<br />

b. M20A1 Room Liner Installation.<br />

(1) Open room liner carrier bag (1) and remove room liner (2).<br />

(2) Carry room liner (2) into prepared room. Place room liner with loop ties facing up. Carefully unfold and<br />

spread liner on floor.<br />

2-22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!