TM 3-4240-313-10 OPERATOR'S MANUAL SIMPLIFIED ...
TM 3-4240-313-10 OPERATOR'S MANUAL SIMPLIFIED ...
TM 3-4240-313-10 OPERATOR'S MANUAL SIMPLIFIED ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>TM</strong> 3-<strong>4240</strong>-<strong>313</strong>-<strong>10</strong><br />
Section III. MAINTENANCE PROCEDURES<br />
3-3. OPERATOR MAINTENANCE.<br />
Operator maintenance is limited to inspection and repair of room liner fabric components, and replacing hose<br />
adapter and filter adapter gaskets.<br />
a. Inspecting. Inspect components of the SCPE as described in PMCS (para 2-5).<br />
b. Repairing. Room liners, PE fabric, ECU adapter duct and air duct hoses can be restored to operating condition<br />
using tape from accessory package.<br />
To repair straight tears on room liner, ECU adapter duct and PE fabric.<br />
NOTE<br />
Silicone is applied to the zippers to permit easier opening and closing. The repair tape will not<br />
stick to areas covered with silicone.<br />
(1) If the area to be repaired is near the zippers use alcohol (Item 1, App D) and a wiping rag (Item <strong>10</strong>, App D)<br />
to clean surface prior to taping.<br />
(2) Cut or tear a strip of tape (Item 12, App D), stored in the accessory package, approximately 4 inches<br />
longer than damaged area.<br />
(3) Position tape over damaged area, pressing firmly in place from top to bottom.<br />
(4) Use cross strips of tape for added strength.<br />
To repair corner cuts or punctures on room liners, ECU adapter duct, and PE fabric.<br />
(1) Using pocket knife, (Item 6, App D) cut repair material, located in accessory package, large enough to<br />
cover damaged area.<br />
(2) Cut or tear a strip of tape approximately 4 inches longer than patch.<br />
(3) Position patch on damaged area and firmly press tape around the edges.<br />
3-5