13.10.2014 Views

pavement design

pavement design

pavement design

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FLEXIBLE PAVEMENT EMPIRICAL DESIGN METHODS<br />

~ GRANULAR BASE EQUIVALENCY (GBE) FACTORS<br />

ONTARIO EXPERIENCE<br />

• NEW PROJECTS<br />

• HOT-MIX ASPHALT (INCLUDING RECYCLED) 2.0<br />

• GRANULAR BASE (CRUSHED, CBR ≥ 60) 1.0<br />

• GRANULAR SUBBASE (CBR < 60) 0.67<br />

• OGDL (NOT RECOMMENDED) 1.0<br />

• RESURFACING PROJECTS<br />

• OLD HOT-MIX ASPHALT 1.25<br />

• OLD GRANULAR BASE 0.75<br />

• OLD GRANULAR SUBBASE 0.50<br />

• RECONSTRUCTION PROJECTS<br />

• OLD HOT-MIX ASPHALT 1.0<br />

• OLD GRANULAR BASE 0.6<br />

• OLD GRANULAR SUBBASE 0.4<br />

• PULVERIZED RAP/GRANULAR BLEND 1.00<br />

• CIP 1.80<br />

• FOAMED/EXPANDED ASPHALT 1.80<br />

• RUBBLIZED BASE CONCRETE 1.0+

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!