Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FLEXIBLE PAVEMENT EMPIRICAL DESIGN METHODS<br />
~ GRANULAR BASE EQUIVALENCY (GBE) FACTORS<br />
ONTARIO EXPERIENCE<br />
• NEW PROJECTS<br />
• HOT-MIX ASPHALT (INCLUDING RECYCLED) 2.0<br />
• GRANULAR BASE (CRUSHED, CBR ≥ 60) 1.0<br />
• GRANULAR SUBBASE (CBR < 60) 0.67<br />
• OGDL (NOT RECOMMENDED) 1.0<br />
• RESURFACING PROJECTS<br />
• OLD HOT-MIX ASPHALT 1.25<br />
• OLD GRANULAR BASE 0.75<br />
• OLD GRANULAR SUBBASE 0.50<br />
• RECONSTRUCTION PROJECTS<br />
• OLD HOT-MIX ASPHALT 1.0<br />
• OLD GRANULAR BASE 0.6<br />
• OLD GRANULAR SUBBASE 0.4<br />
• PULVERIZED RAP/GRANULAR BLEND 1.00<br />
• CIP 1.80<br />
• FOAMED/EXPANDED ASPHALT 1.80<br />
• RUBBLIZED BASE CONCRETE 1.0+