13.10.2014 Views

pavement design

pavement design

pavement design

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LIFE-CYCLE COST ANALYSIS<br />

• ECONOMIC ASSESSMENT OF COMPETING, TECHNICALLY<br />

SUITABLE SYSTEMS OVER DESIGN LIFE<br />

• COST COMPONENTS<br />

INITIAL COSTS (CAPITAL COSTS)<br />

MAINTENANCE COSTS<br />

REHABILITATION COSTS<br />

RESIDUAL/SALVAGE VALUES<br />

USER COSTS (TRAFFIC DELAY FOR INSTANCE)<br />

• PRESENT WORTH METHOD<br />

ANALYSIS PERIOD (TYPICALLY 30 TO 40 YEARS – AT LEAST ONE<br />

REHABILITATION)<br />

DISCOUNT RATE (TYPICALLY ABOUT 4 PERCENT)<br />

PRESENT WORTH (REMEMBER RULE OF 72)<br />

• FOAMED ASPHALT WITH HMA OVERLAY LIFE-CYCLE COST<br />

ANALYSES GENERALLY VERY FAVOURABLE COMPARED TO<br />

PULVERIZE/'THICKER ' HMA OR MILL/RECYCLED HMA/HMA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!