FLEXIBLE PAVEMENT DESIGN<br />
LIFE-CYCLE COST ANALYSIS<br />
PULVERIZE 200 mm<br />
40 mm HL 8<br />
50 mm OF HL 3<br />
EXAMPLE<br />
FOAMED COLD IN-PLACE ASPHALT<br />
OR RECYCLE CIR 100 mm<br />
50 mm OF HL 3<br />
MILL 40 mm<br />
65 mm OF RECYCLED HL 8<br />
50 mm OF HL 3<br />
INITIAL COST 29,526 31,275 35,700<br />
PRESENT<br />
WORTH OF<br />
MAINT. COSTS<br />
PRESENT<br />
WORTH OF<br />
REHAB. COSTS<br />
PRESENT<br />
WORTH OF<br />
RESIDUAL<br />
COSTS<br />
TOTAL<br />
PRESENT<br />
WORTH OF<br />
COSTS<br />
12,322 13,715 12,332<br />
22,478 8,706 22,478<br />
(10,178) (2,175) (10,277)<br />
54,158 51,521 60,233<br />
RANK 2 1 3