<strong>Meridian</strong> owns and operates the largest<br />

portfolio of renewable electricity assets<br />

in New Zealand, providing around onethird<br />

of the country’s generation.<br />

Each time we experience extraordinarily low hydro inflows, <strong>Meridian</strong><br />

and the rest of the electricity industry refine the tools for dealing<br />

with these events. This year <strong>Meridian</strong> was very encouraged by the<br />

joint industry approach of the Winter Task Force, as well as the<br />

public savings campaign which helped to limit demand and ensure<br />

a market was maintained in both the North Island and South Island.<br />

<strong>Meridian</strong> worked to ensure the best possible response to the challenges<br />

of the low hydro inflows, developing a range of tactics to<br />

protect storage, promote energy conservation to customers and<br />

maximise southward flow on the inter-island HVDC link.<br />

Of particular note is the contribution <strong>Meridian</strong>’s two wind farms made,<br />

generating around 478GWh of electricity during the 2007/08 year.<br />

A heritage of excellence in<br />

renewable generation<br />

<strong>Meridian</strong> owns and operates the largest portfolio of renewable<br />

electricity assets in New Zealand, providing around one third of the<br />

country’s generation. Since making a commitment in 2004 to remain<br />

a 100 percent renewable generator, <strong>Meridian</strong> has pursued excellence<br />

in its generation operations by making significant investment to<br />

upgrade systems and generation facilities.<br />

A highlight was the multi-million dollar half-life upgrade of Manapouri,<br />

New Zealand’s largest hydro station. This was completed during<br />

the 2007/08 year and represents the first major work on the station<br />

since it was commissioned in the late 1960s. The Manapouri half-life<br />

upgrade was a major capital investment and was completed on<br />

time and within budget, while at the same time implementing a<br />

number of innovative engineering and management techniques.<br />

Upgrading and improving the efficiency of existing plant delivers<br />

significant sustainability benefits, including better environmental<br />

monitoring and protection systems, as well as better reliability and<br />

plant utilisation.<br />

We began refurbishment of the 540MW Benmore station – the largest<br />

in the Waitaki chain – during the 2007/08 year. It will deliver substantial<br />

improvements in efficiency and reliability of the turbines as<br />

well as a significant increase in the amount of electricity generated<br />

each year from the same volume of water.<br />

<strong>Meridian</strong> achieved outstanding plant availability and reliability<br />

during the 2007/08 year. This helped <strong>Meridian</strong> maintain the reserve<br />

capacity needed to ensure the reliability of the national grid.