Meridian Annual Report - Meridian Energy
Meridian Annual Report - Meridian Energy
Meridian Annual Report - Meridian Energy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
11<<br />
<strong>Meridian</strong> owns and operates the largest<br />
portfolio of renewable electricity assets<br />
in New Zealand, providing around onethird<br />
of the country’s generation.<br />
Each time we experience extraordinarily low hydro inflows, <strong>Meridian</strong><br />
and the rest of the electricity industry refine the tools for dealing<br />
with these events. This year <strong>Meridian</strong> was very encouraged by the<br />
joint industry approach of the Winter Task Force, as well as the<br />
public savings campaign which helped to limit demand and ensure<br />
a market was maintained in both the North Island and South Island.<br />
<strong>Meridian</strong> worked to ensure the best possible response to the challenges<br />
of the low hydro inflows, developing a range of tactics to<br />
protect storage, promote energy conservation to customers and<br />
maximise southward flow on the inter-island HVDC link.<br />
Of particular note is the contribution <strong>Meridian</strong>’s two wind farms made,<br />
generating around 478GWh of electricity during the 2007/08 year.<br />
A heritage of excellence in<br />
renewable generation<br />
<strong>Meridian</strong> owns and operates the largest portfolio of renewable<br />
electricity assets in New Zealand, providing around one third of the<br />
country’s generation. Since making a commitment in 2004 to remain<br />
a 100 percent renewable generator, <strong>Meridian</strong> has pursued excellence<br />
in its generation operations by making significant investment to<br />
upgrade systems and generation facilities.<br />
A highlight was the multi-million dollar half-life upgrade of Manapouri,<br />
New Zealand’s largest hydro station. This was completed during<br />
the 2007/08 year and represents the first major work on the station<br />
since it was commissioned in the late 1960s. The Manapouri half-life<br />
upgrade was a major capital investment and was completed on<br />
time and within budget, while at the same time implementing a<br />
number of innovative engineering and management techniques.<br />
Upgrading and improving the efficiency of existing plant delivers<br />
significant sustainability benefits, including better environmental<br />
monitoring and protection systems, as well as better reliability and<br />
plant utilisation.<br />
We began refurbishment of the 540MW Benmore station – the largest<br />
in the Waitaki chain – during the 2007/08 year. It will deliver substantial<br />
improvements in efficiency and reliability of the turbines as<br />
well as a significant increase in the amount of electricity generated<br />
each year from the same volume of water.<br />
<strong>Meridian</strong> achieved outstanding plant availability and reliability<br />
during the 2007/08 year. This helped <strong>Meridian</strong> maintain the reserve<br />
capacity needed to ensure the reliability of the national grid.