MISSION PLAN - PDS Small Bodies Node
MISSION PLAN - PDS Small Bodies Node
MISSION PLAN - PDS Small Bodies Node
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The communications schedule only includes those communications events that require a<br />
slew. This results in no slews for some portions of launch (LGA comm: L+0-30 days),<br />
EGA (LGA comm: L+708-727 days), encounter (L+1789-1804 days), and return (LGA<br />
comm: L+2509-2535 days).<br />
10.2.3 Model Parameters and Characteristics<br />
The background attitude schedule, communications and OPNAV schedules used in the<br />
current modeling runs are summarized in Tables 10.2-5 through 10.2-7. The resultant ∆V<br />
magnitudes and directions are illustrated in Figures 10.2-2 through 10.2-4.<br />
dV magnitude (m/s)<br />
Declination (deg) [eme'2000]<br />
0.030<br />
0.025<br />
0.020<br />
0.015<br />
0.010<br />
0.005<br />
0.000<br />
40<br />
30<br />
20<br />
10<br />
0<br />
-10<br />
-20<br />
-30<br />
-40<br />
pitch/yaw/pitch<br />
5,6-8-1,2-5,6-8-5,6<br />
yaw/pitch<br />
(8,1,5,8)<br />
pitch/yaw combined<br />
(slews 3,7)<br />
pitch < 15°<br />
(slews 1,5)<br />
pitch > 15°<br />
(slews 2,6)<br />
d/b clamp<br />
(slew 4)<br />
mode<br />
comm<br />
opnav<br />
0 2 4 6 8 10 12 14 16 18 20 22 24 26<br />
Time (100 days from Launch)<br />
Figure 10.2-2 Slew ∆V Magnitude Profile<br />
dV<br />
ToSun<br />
ToEar<br />
all<br />
mode<br />
chgs<br />
one-way<br />
0 2 4 6 8 10 12 14 16 18 20 22 24 26<br />
Time (100 days from launch)<br />
Figure 10.2-3 Slew ∆V Direction Comparison - Declination<br />
123