MISSION PLAN - PDS Small Bodies Node
MISSION PLAN - PDS Small Bodies Node
MISSION PLAN - PDS Small Bodies Node
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Launch<br />
Initial Acquisition<br />
TCM-1<br />
Activation and Checkout<br />
0 - 30<br />
0 - 1<br />
15<br />
1 - 30<br />
30<br />
1<br />
-<br />
29<br />
3.2 Initial Acquisition Subphase<br />
The initial acquisition subphase includes all activities from launch vehicle liftoff to<br />
completion of Deep Space Network (DSN) acquisition. Although one complete day is<br />
allocated for this activity, selection of the short coast launch option allows these activities<br />
to be completed within three hours of launch.<br />
Prior to liftoff (L/O), the spacecraft is powered on via launch vehicle umbilical power at<br />
L/O-240 minutes. The spacecraft is transferred to internal battery power at L/O-4<br />
minutes. At this time the spacecraft is electrically configured for initial cruise mode with<br />
the exception that solar panels are not deployed and the solid-state power amplifier<br />
(SSPA) is off.<br />
The activities from liftoff to spacecraft separation are summarized in Table 3.2-1 and<br />
illustrated in Figure 3.2-1. It should be noted that the numbers presented are specific to a<br />
February 6 launch date, but are typical of other launch dates. However, the specific<br />
numbers are provided for illustrative purposes only and are subject to change as mission<br />
plans mature.<br />
Table 3.2-1 Injection Activities<br />
Event L/O+(sec) (min) Comments<br />
PRE-LAUNCH<br />
1 Spacecraft power ON -86400.0 -1440.0 Latch Valves Closed & System<br />
Wet; EPS, C&DH, Rcvr, & DST<br />
powered<br />
2 Switch to internal power –240.0 -4.0 On batteries<br />
3 Liftoff 0.0 0.0<br />
PRE-SEPARATION<br />
4 Power on Prop Heaters 241.0 4.0 1 lb thrusters, valve, line, tank<br />
5 Main engine cutoff (MECO) 264.0 4.4<br />
6 Stage II ignition 277.7 4.6<br />
7 9.5 ft fairing separation 284.0 4.8<br />
8 First Stage II cutoff (SECO 1) 597.3 10.0<br />
9 Enter Solar Eclipse 902.0 15.0 02/06/99 launch<br />
10 Restart Stage II 1309.8 21.8<br />
11 SECO 2 1414.0 23.6<br />
12 Stage II separation 1467.0 24.5<br />
13 Power on IMU 1485.0 24.8 sep - 2 min, earliest across LP<br />
14 Stage III ignition 1504.0 25.1<br />
15 Stage III burnout 1569.3 26.2<br />
16 Spacecraft separation 1639.0 27.3 Assumes 69.7 seconds coast<br />
17 Open Latch Valves 1640.0 27.3 sep + 1 sec<br />
18 Deploy LV Stage III Yo 1642.0 27.4<br />
DESPIN<br />
46