19 Start S/C despin 1643.0 27.4 delayed to gain sep distance<br />

20 Complete despin 1764.0 29.4 rates < 0.2 deg/s<br />

21 Power on Star Camera 1764.0 29.4<br />

22 Begin attitude acquisition 1764.0 29.4<br />

23 Primary string to 1 lb thrusters 1883.0 31.4<br />

24 Disarm thrusters 1884.0 31.4 No torques during SA deploy<br />

Table 3.2-1 Injection Activities (cont.)<br />

Event L/O+ (sec) (min) Comments<br />

SOLAR ARRAY DEPLOY<br />

25 Start Solar Array Deploy 1885.0 31.4<br />

26 End Solar Eclipse 2231.0 37.2 02/06/99 launch<br />

27 Complete Solar Array Deploy 2785.0 46.4 15 min alloc,