07.11.2014 Views

MISSION PLAN - PDS Small Bodies Node

MISSION PLAN - PDS Small Bodies Node

MISSION PLAN - PDS Small Bodies Node

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.3.2.2 ∆V Budget<br />

The total ∆V budget is summarized in Table 2.3-2.a. It is based primarily on the<br />

maximum total of deterministic maneuvers across the launch period, 260 m/s, and the<br />

estimate of the required statistical trajectory correction maneuvers. Note that the<br />

unallocated ∆V reserve amounts to 37 m/s. The statistical maneuver history for a Feb. 6<br />

launch is shown in Table 2.3-2.b and leads to the allocation of 63 m/s indicated in Table<br />

2.3-2.a.<br />

Table 2.3-2.a ∆V Budget Summary<br />

Deterministic (m/s) Notes<br />

DSMs 260 Three or four DSMs depending on LD. Max of 20-day LP<br />

(2/14).<br />

Launch Window ± 1 min 2 For collision avoidance with space debris etc.<br />

Slew ∆V effects 5 Cost of ACS Slew ∆V when modeled in Navigation software<br />

Return divert 15 For S/C divert away from earth, executed at ~ 4 hrs before entry<br />

Statistical<br />

TCMs (19) 63 See Table 2.3-2.b for representative profile<br />

ACS Modeling Error 10 Cost in ∆V due to the difference between models and actuals<br />

Sub-Totals 355<br />

Reserve 22 Additional 17 m/s available for full propellant load (85 kg)<br />

Total 377 Initial design requirement<br />

Table 2.3-2.b Maneuver History<br />

Maneuver Epoch Execution Date ∆V-95% (m/s)<br />

TCM-1 L + 15 d 21 Feb 99 44.93<br />

TCM-2 DSM-1 10-14 Mar 00 169.80<br />

TCM-3 DSM-1 + 30 d 13 Apr 00 2.86<br />

TCM-4 EP - 60 d 16 Nov 00 0.44<br />

TCM-5 EP - 10 d 05 Jan 01 0.32<br />

TCM-6 EP + 30 d 14 Feb 01 2.74<br />

TCM-7 DSM-2 13 Mar 02 0.75<br />

TCM-8 DSM-3 04-06 Jul 03 69.87<br />

TCM-9 DSM-3 + 7 d 13 Jul 03 1.48<br />

TCM-10 WCA - 30 d 03 Dec 03 2.26<br />

TCM-11 WCA - 10 d 23 Dec 03 1.46<br />

TCM-12 WCA - 2 d 31 Dec 03 2.60<br />

TCM-13 WCA - 18 h 02 Jan 04 2.02<br />

TCM-14 WCA - 6 h 02 Jan 04 1.31<br />

TCM-15 DSM4 (WCA + 30 d) 01 Feb 04 7.52<br />

TCM-16 3rd aphelion 01 Oct 04 0.66<br />

TCM-17 ER - 60 d 16 Nov 05 2.63<br />

TCM-18 ER - 13 d 02 Jan 06 0.36<br />

TCM-19 ER - 1 d 14 Jan 06 0.23<br />

* Analysis completed 11/20/98, corresponds to 2/6 launch, DTO trajectories and PMA LV covariance.<br />

2.3.2.3 Alternate Launch Periods<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!