07.11.2014 Views

TELE-X - a Satellite System for TV and Data Communication ...

TELE-X - a Satellite System for TV and Data Communication ...

TELE-X - a Satellite System for TV and Data Communication ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LPB 110, a <strong>System</strong> <strong>for</strong><br />

Controlled Test Traffic<br />

Bengt Jansson, Kent Johansson <strong>and</strong> Tommy Ostlund<br />

In the testing of telecommunication systems dem<strong>and</strong>s are made <strong>for</strong> shorter test<br />

times <strong>and</strong> at the same time the equipment being tested becomes increasingly<br />

complex. Powerful <strong>and</strong> efficient aids are there<strong>for</strong>e required, primarily <strong>for</strong> the<br />

testing of whole systems. Ericsson has developed such a test system. LPB 110,<br />

which has been designed to generate <strong>and</strong> terminate test traffic.<br />

The authors describe LPB 110 <strong>and</strong> how it can be used <strong>for</strong> design, production <strong>and</strong><br />

installation testing of Ericsson systems <strong>and</strong> also other systems.<br />

UDC 621 395.2/ 3.001 4<br />

Fig. 1<br />

Test equipment developed during the 1930s,<br />

1950s <strong>and</strong> 1970s<br />

Over the years various types of devices<br />

have been used <strong>for</strong> testing telephone<br />

equipment at system level. These test<br />

devices have often been developed <strong>for</strong><br />

specific applications, fig. 1.<br />

The need <strong>for</strong> more general test equipment<br />

has arisen <strong>for</strong> various reasons,<br />

partly because of the rapid technical development<br />

in the field of telecommunications.<br />

New dem<strong>and</strong>s have been<br />

made on existing test equipment, <strong>and</strong><br />

new test requirements have arisen <strong>for</strong><br />

newly developed system parts. Dem<strong>and</strong>s<br />

from the users have led to a modular<br />

structure, so that the equipment<br />

can easily be modified <strong>for</strong> different requirements,<br />

<strong>and</strong> the same facilities <strong>for</strong><br />

man-machine communication as in<br />

stored program controlled telephone<br />

exchanges.<br />

In order to exploit design resources efficiently<br />

they were brought together in a<br />

project, in which all requirements were<br />

<strong>for</strong>mulated in collaboration with representatives<br />

from the system <strong>and</strong> installation<br />

testing departments The test system<br />

developed in accordance with these<br />

requirements, LPB 110, can be used <strong>for</strong><br />

all autonomous testing at signal interfaces<br />

towards telephone equipment, <strong>for</strong><br />

example towards MDF, where LPB 110<br />

can simulate the environment of a telephone<br />

exchange, fig 2.<br />

Test facilities<br />

LPB 110 has been designed to generate<br />

<strong>and</strong> terminate controlled test traffic, primarily<br />

in connection with design, production<br />

<strong>and</strong> installation testing, including<br />

acceptance testing, but it can of<br />

course also be used <strong>for</strong> testing equipment<br />

in service, <strong>for</strong> example <strong>for</strong> traffic<br />

route testing.<br />

LPB 110 can simulate the functions of<br />

the subscriber <strong>and</strong> junction lines in the<br />

surrounding network <strong>and</strong> hence can<br />

simulate all connection types, i.e. local,<br />

incoming, outgoing <strong>and</strong> transit calls.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!