� Manifold structure housing cooling spool, multiphase flowmeter, pigging/future tie-in points;<br />

� Tie-in spools and controls jumpers between well and manifold and between manifold and<br />

pipelines;<br />

� A 2km 6" production pipeline. The pipeline may be snake laid on the seabed, trenched and<br />

backfilled, or trenched or rock dumped.<br />

� A 2km 3-inch gaslift line piggybacked to 6" production line or laid and trenched independently.<br />

Multi-function umbilical will be provided for control, chemical injection and scale-treatment.<br />

� Tie-in spools between manifold / pipeline, and pipeline / riser at Howe;<br />

� Topsides modifications covering control system upgrades, chemical injection and storage<br />

facilities.<br />

As part of the project planning process, a full Environmental Impact Assessment is being carried out<br />

for this activity and once this is completed, we will be submitting an Environmental Statement for the<br />

development. In line with DTI regulations [The Offshore Petroleum Production and Pipe-lines (Assessment of<br />

Environmental Effects) Regulations 1999], the Environmental Statement will be available and open for<br />

public consultation as part of the approval process.<br />

In addition and as part of Shell’s commitment to Health, Safety and the Environment in the pursuit of<br />

the goal of no harm to people, protection of the environment and the efficient use of materials and<br />

energy, we intend to consult widely with all who may have an interest in our project activities and invite<br />

you for further dialogue, should you wish to take part in such consultations.<br />

If you would be interested, I would be grateful if you could complete the attached form and return it to<br />

Paul Wood at the above address, or by e-mail to Bill.Gray@shell.com by 27 th March. Please pass the<br />

form to anyone else in your organisation that might also be an appropriate contact for consultation.<br />

Yours sincerely<br />

Bill Gray<br />

Project Manager, Bardolino field development.<br />