Bardolino Development Environmental Statement<br />
Table 1.1: Summary of consultations undertaken<br />
Date Consultees Issues Discussed<br />
25 th Feb 2008 Meeting: JNCC & BERR JNCC indicated that survey data for the pipeline should<br />
ideally be presented within the ES. As the project<br />
involves only a 2 km long line, 1 km of which will be<br />
within the 500 m zones of Bardolino and Howe, JNCC<br />
suggested that if the data is not available the survey<br />
work that has/will be undertaken be described within<br />
the ES with further details, including results, provided in<br />
the subsequent PON 15s.<br />
13 th Mar 2008 Scottish Fisherman’s<br />
Federation (SFF)<br />
13 th Mar 2008 Fisheries Research<br />
Service (FRS)<br />
13 th Mar 2008 Marine Conservation<br />
Society<br />
13 th Mar 2008 Royal Society for the<br />
protection of Bird<br />
(RSPB)<br />
JNCC do not believe that modelling of drill cuttings<br />
would add to the ES application and would not expect<br />
this work to be undertaken.<br />
JNCC advised that within the ES, Shell should consider<br />
whether any of their activities are likely to cause<br />
'deliberate disturbances’ to a European Protected<br />
Species. Whilst Shell need to carry out the assessment,<br />
JNCC believe that the use of an MMO, daylight piling,<br />
and other measures, are likely to provide sufficient<br />
mitigation.<br />
Consultation letter sent to both JNCC and BERR on 13 th<br />
March 2008.<br />
Consultation letter sent. No response prior to<br />
submission of the ES.<br />
Consultation letter sent. Responded asking to be kept<br />
informed on the progress of the project.<br />
Consultation letter sent. No response prior to<br />
submission of the ES.<br />
Consultation letter sent. Responded asking to be kept<br />
informed on the progress of the project.<br />
13 th Mar 2008 Defence Estates Consultation letter sent. Responded indicating an<br />
interest in an opportunity to discuss the development.<br />
13 th Mar 2008 Aberdeen Coastguard<br />
Offshore Oil & Gas<br />
Team<br />
13 th Mar 2008 Coastguard Agency<br />
MPCU<br />
13 th Mar 2008 Scottish Government<br />
Marine Directorate<br />
1.7 AREAS OF UNCERTAINTY<br />
Consultation letter sent. No response prior to<br />
submission of the ES.<br />
Consultation letter sent. Responded asking to be kept<br />
informed on the progress of the project.<br />
Consultation letter sent. No response prior to<br />
submission of the ES.<br />
Several aspects of the proposed development plan described in this ES are subject to a<br />
degree of uncertainty, as a result of the level of technical definition appropriate for the current<br />
stage of the project. These are discussed at appropriate points in the text of the ES, together<br />
with any significant implications with respect to environmental impact. The most important of<br />
these uncertainties are:<br />
� Unforeseen problems during drilling (such as geological obstruction or mechanical<br />
failure) may require the well to be side-tracked, or a spare well slot to be used.<br />
April 2008 Page 1-5