Bardolino Development Environmental Statement<br />

The production separation train consists of a single three-phase separator and a plate<br />

coalescer.<br />

3.6.2 Modifications to Howe infrastructure<br />

Minor modifications will be required to the Howe subsea infrastructure as a result of the<br />

Bardolino project. A new subsea electrical distribution box (EDB) and a new subsea valve<br />

skid will be installed at the Howe Pipeline Tie-in structure (PTS). A new regulator and<br />

associated valves will be fitted to the Howe hydraulic power unit (HPU). These modifications<br />

will entail the presence of a DP DSV at Howe for approximately 15 days during June 2009.<br />

The atmospheric emissions from these vessel operations have been calculated and are given<br />

in Table 3.6.<br />

3.6.3 Topsides Modifications at Nelson<br />

To accommodate the introduction of produced fluids from Bardolino it is necessary to add a<br />

H2S scavenger package to the Nelson topsides facilities. Work will involve the addition of an<br />

H2S scavenger storage and injection skid with associated pipe work and on-line analysers.<br />

This work on the topsides will be undertaken using normal supply vessel transport to Nelson<br />

and no additional vessel trips or days will be required.<br />

3.6.4 Production Start-up<br />

Production start-up plans are yet to be detailed. Initially, the well will be brought on-stream up<br />

to the choke valve in accordance with normal Shell well start-up procedures.<br />