Bardolino Development Environmental Statement<br />

Table 3.1: Overview of the Bardolino Development concept selection<br />

Concept Concept Description Technical Evaluation Environmental Evaluation<br />

1. Remote subsea<br />

development with 3.5 km<br />

tie-back to Howe Drill<br />

Centre.<br />

Note -Since the initial<br />

development option<br />

study, the proposed well<br />

location was moved to a<br />

position 2 km from the<br />

Howe PTS. This was to<br />

ensure that the field are<br />

did not extend into the<br />

adjacent Howe block and<br />

to avoid the need for a<br />

subsea pipeline crossing<br />

over the Langeled<br />

pipeline.<br />

2. Subsea development<br />

with deviated well drilled<br />

from Howe Drill Centre.<br />

• Single well drilled from mobile drilling<br />

unit (92 days)<br />

• Production manifold and pipeline<br />

installation from Bardolino well to<br />

Howe<br />

• Production route through Howe to<br />

existing Nelson Platform<br />

• Modifications to Nelson<br />

• Single well drilled from mobile drilling<br />

unit (110 days), longer top hole<br />

section and more cuttings<br />

• No new pipeline installation, or<br />

production manifold installation<br />

• Production route through Howe to<br />

existing Nelson Platform<br />

• Modifications to Nelson<br />

• Tried and tested methodology<br />

• A combination of longer reach<br />

drilling with high temperature<br />

reservoir would give higher<br />

risks during the execution<br />

phase. The project risk would<br />

be less attractive to Shell with<br />

this concept.<br />

• Key Strengths: Shorter drilling time therefore lower<br />

emissions to air and sea. Shorter well bore therefore<br />

lower volumes of generated cuttings and chemical use<br />

and discharge.<br />

• Key weaknesses: Pipeline installation required with<br />

associated vessel use, increased seabed footprint and<br />

chemical use and discharge.<br />

• Key Strengths: No pipeline installation required,<br />

smaller amount of seabed disturbance.<br />

• Key Weaknesses: Longer drilling time, more emissions<br />

to air and sea. Longer top hole section generating<br />

greater volume of cuttings and requiring more use and<br />

discharge of chemicals.<br />

April 2008 Page 3-3