New Jersey Schools Development Authority<br />

Design-Build Performance Specifications<br />

New Caruso Elementary School<br />

Keansburg Public Schools<br />

D. Environmental Impacts<br />

1. Construct all foundations in accordance with all codes, regulations, and the requirements<br />

and restrictions detailed in the Design-Build Information Package, specifically including<br />

the following:<br />

a. No Further Action Letter, May 26, 2010.<br />

b. Utility Investigation Analysis Report, May 2013.<br />

c. Regulatory Review Report, May 2013.<br />

d. Geophysical Investigation Report, May 22, 2013.<br />

e. Preliminary Geotechnical Investigation and Recommendation Report, May 2013.<br />

f. Preliminary Storm Water and Groundwater Investigation Report, May 2013.<br />

2. Construct all foundations in conformance with sitework plans and specifications<br />

approved by the Authority’s LSRP, in accordance with the Post Demolition Site<br />

Conditions Report and all project requirements.<br />

END OF SECTION A1000.00<br />

June 27, 2013 Section A1000.00 Page 2 <strong>of</strong> 2<br />

Foundations