New Jersey Schools Development Authority<br />

Design-Build Performance Specifications<br />

New Caruso Elementary School<br />

Keansburg Public Schools<br />

9. Provide cutouts and reinforcing for security devices as required.<br />

J. Door Finish Schedule<br />

1. Basis <strong>of</strong> Design: Factory-applied PPG Duranar fluoropolymer coatings; colors to be<br />

determined.<br />

a. Provide G90 galvanizing and factory prime coat(s) on ferrous components.<br />

END OF SECTION B2050.30<br />

June 27, 2013 Section B2050.30 Page 4 <strong>of</strong> 4<br />

Exterior Oversize Doors