Thompson Creek Flood Study Report - City of Peterborough
Thompson Creek Flood Study Report - City of Peterborough
Thompson Creek Flood Study Report - City of Peterborough
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Thompson</strong> <strong>Creek</strong> Detailed <strong>Flood</strong> Reduction <strong>Study</strong><br />
<strong>City</strong> <strong>of</strong> <strong>Peterborough</strong><br />
the public to the study, to request information on flooding issues and solicit their input<br />
into the problem definition. Documentation is included in Appendix B.<br />
Public Information Centre No. 2<br />
Phase 2 <strong>of</strong> the Class EA process involves a number <strong>of</strong> steps including identifying all<br />
reasonable alternative solutions to the problem, documenting the existing environment,<br />
evaluating the alternative solutions and consulting with appropriate review agencies and<br />
the public in order to identify the preferred solution. As part <strong>of</strong> the identification <strong>of</strong> the<br />
preferred solution, i.e. the projects, programs and policies that will be included in the<br />
<strong>Thompson</strong> <strong>Creek</strong> <strong>Flood</strong> Reduction Plan, a second Public Information Centre was held<br />
to obtain comments from the public on the alternatives considered and the draft plan.<br />
This occurred on May 23rd, 2007. The information presented at that meeting, the<br />
comments received and the means by which they were addressed are all documented in<br />
Appendix B.<br />
Technical Advisory Committee (TAC) and Public Advisory Committee (PAC)<br />
Two advisory committees were formed by the <strong>City</strong> <strong>of</strong> <strong>Peterborough</strong> to guide the<br />
direction <strong>of</strong> the study and provide input from agency and public stakeholders. The<br />
Technical Advisory Committee (TAC) consisted <strong>of</strong> representatives <strong>of</strong> various<br />
departments <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Peterborough</strong>, the County <strong>of</strong> <strong>Peterborough</strong>, the Otonabee<br />
Region Conservation Authority (ORCA), the Ministry <strong>of</strong> Natural Resources (MNR),<br />
the Trent Severn Waterway (TSW) and the Department <strong>of</strong> Fisheries and Oceans Canada<br />
(DFO). Members are listed in Table 1.1. A Public Advisory Committee (PAC) was<br />
formed during the completion <strong>of</strong> the city-wide <strong>Flood</strong> Master Plan. It was originally<br />
intended to continue and be common to all <strong>of</strong> the subsequent detailed flood studies<br />
including the <strong>Thompson</strong> <strong>Creek</strong> study. However, the PAC was disbanded prior to<br />
completion <strong>of</strong> this study.<br />
Issuance <strong>of</strong> Notice <strong>of</strong> Completion<br />
A formal Notice <strong>of</strong> <strong>Study</strong> Completion was published in the media in July, 2007. It was<br />
also sent directly to relevant agencies and all members <strong>of</strong> the public who had requested<br />
to be included on the project mailing list. The notice advised <strong>of</strong> the availability <strong>of</strong> the<br />
draft <strong>Thompson</strong> <strong>Creek</strong> Detailed <strong>Flood</strong> Reduction <strong>Study</strong> <strong>Report</strong>. The document was<br />
made available to the public for the statutory 30 day review period. Documentation <strong>of</strong><br />
these actions, comments received by the expiry date <strong>of</strong> that period and the means by<br />
which they were addressed is also provided in Appendix B.<br />
In compliance with the Class EA requirements, this report includes a description <strong>of</strong> the<br />
project and its purpose, identification <strong>of</strong> alternatives, inventory <strong>of</strong> natural, social and<br />
14-06605-01-W01 <strong>City</strong> <strong>of</strong> <strong>Peterborough</strong> 6