16.11.2014 Views

Marine Generator Panda PMS 8 „mini“ E-TEC Icemaster Fischer ...

Marine Generator Panda PMS 8 „mini“ E-TEC Icemaster Fischer ...

Marine Generator Panda PMS 8 „mini“ E-TEC Icemaster Fischer ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance Instructions<br />

B.3 Execution of an oil change<br />

Oil drain hose<br />

For the oil change an oil drain hose is lead<br />

through the sound cover.<br />

Oil drain screw<br />

The oil can be discharged by opening the<br />

oil drain screw. For countering use a<br />

second wrench.<br />

17<br />

Oil drain pump<br />

If discharging of the oil is not possible, we<br />

recommend the employment of a hand<br />

pump, which can be attached to the oil<br />

drain hose.<br />

Afterwards the oil drain screw is closed<br />

again.<br />

Page 16<br />

<strong>Panda</strong> <strong>PMS</strong> 8 "mini" E-<strong>TEC</strong> s00585 - Chapter B: Maintenance Instructions

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!