18.11.2014 Views

KM-650MAH-E Service manual - Hoshizaki

KM-650MAH-E Service manual - Hoshizaki

KM-650MAH-E Service manual - Hoshizaki

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. Sequence Flow Chart<br />

a) "E" Control Board:<br />

<strong>KM</strong>-320MAH-E and <strong>KM</strong>-<strong>650MAH</strong>-E Auxiliary Code U-0 and Earlier<br />

<strong>KM</strong>-515MAH-E Auxiliary Code U-1 and Earlier<br />

"E" Control Board Sequence Flow Chart<br />

<strong>KM</strong>-320MAH-E, <strong>KM</strong>-515MAH-E, <strong>KM</strong>-<strong>650MAH</strong>-E<br />

4. Pump-Out Cycle<br />

• Factory set for every<br />

10th cycle (S4 dip<br />

switch 5 & 6)<br />

• Pump motor stops<br />

for 2 sec., then<br />

reverses for 10/20<br />

sec. (S4 dip switch<br />

3 & 4)<br />

3. Freeze Cycle<br />

• Minimum freeze time: 5 min.<br />

• Maximum freeze time: freeze<br />

timer setting<br />

(S4 dip switch 9 & 10)<br />

5-min.<br />

minimum F/S in control<br />

freeze timer in<br />

control<br />

2. Harvest Cycle<br />

• Maximum inlet water valve time: 6 min.<br />

• Maximum harvest time: 20 min.<br />

1. 1-Minute<br />

Fill Cycle<br />

Cycle<br />

Steps<br />

1 to 3-min. harvest<br />

timer in control<br />

(S4 dip switch 1 & 2)<br />

Thermistor<br />

in control<br />

Startup<br />

F/S closed<br />

F/S check<br />

F/S closed<br />

Comp continues<br />

HGV energized<br />

WV energized (dependent on<br />

pump-out timer setting)<br />

PM de-energizes for 2 sec.,<br />

then reverses for 10/20 sec.<br />

FM de-energized<br />

LLV de-energized<br />

F/S open or<br />

freeze timer<br />

terminates<br />

F/S check<br />

Comp continues<br />

FM energized<br />

LLV energized<br />

PM energized<br />

HGV de-energized<br />

WV de-energized<br />

Thermistor temperature<br />

reaches 48°F (9°C) (3.9<br />

kΩ or less). Harvest<br />

timer starts (1 to 3 min.).<br />

F/S open<br />

WV continues<br />

Comp energized<br />

HGV energized<br />

WV energized<br />

F/S open<br />

17<br />

If F/S is open, Comp stops and cycle returns to 1-min. fill.<br />

Legend:<br />

Comp–compressor<br />

FM–fan motor<br />

F/S–float switch<br />

HGV–hot gas valve<br />

LLV–liquid line valve (<strong>KM</strong>-515MAH-E)<br />

PM–pump motor<br />

TBC–themostatic bin control<br />

WV–inlet water valve<br />

3. Ice Level Lowered<br />

No ice touching<br />

TBC bulb.<br />

Icemaker starts at<br />

"1. 1-Minute Fill Cycle."<br />

2. Icemaker Off<br />

All components<br />

de-energized.<br />

1. Bin Full<br />

Within 10 sec.<br />

after ice contacts<br />

TBC bulb,<br />

icemaker shuts<br />

down.<br />

Shutdown<br />

and Restart<br />

To 1 above<br />

TBC<br />

Operation<br />

TBC closed<br />

TBC open<br />

All components<br />

de-energized<br />

Ice contacts TBC bulb<br />

Components Energized when the Control Switch is in the "WASH" Position<br />

The "WASH" position on the control switch is used when cleaning and sanitizing the icemaker. When in<br />

the "WASH" position, power is supplied to the pump motor. With the cleaning valve closed, the cleaner and<br />

sanitizer flow over the outside of the evaporator plate assembly. With the cleaning valve open, the cleaner and<br />

sanitizer flow over both the outside and the inside of the evaporator plate assembly.<br />

Note: Close the cleaning valve after cleaning and sanitizing are complete, otherwise the icemaker will not<br />

restart when the control switch is placed in the "ICE" position.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!