18.11.2014 Views

KM-650MAH-E Service manual - Hoshizaki

KM-650MAH-E Service manual - Hoshizaki

KM-650MAH-E Service manual - Hoshizaki

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7) Normal Harvest Cycle – same as the initial harvest cycle – See "IV.A.4) Initial Harvest<br />

Cycle."<br />

8) Shutdown<br />

a) Thermostatic Bin Control:<br />

<strong>KM</strong>-320MAH-E and <strong>KM</strong>-<strong>650MAH</strong>-E Auxiliary Code U-0 and Earlier<br />

<strong>KM</strong>-515MAH-E Auxiliary Code U-1 and Earlier<br />

When the icemaker is running hold ice in contact with the thermostatic bulb,<br />

TBC switch opens within 10 seconds, shutting down the icemaker. TBC is<br />

factory set, and generally no adjustment is required. However, adjustment<br />

may be needed in some conditions, particularly at higher altitude locations.<br />

NOTICE! Do not adjust S4 dip switch 7 out of the factory default position<br />

on this model. This dip switch must be left in the factory default position<br />

or this icemaker will not operate correctly. Diagnosis: See "IV.C.1.<br />

Thermostatic Bin Control Check: Auxiliary Code U-0 and Earlier."<br />

b) Mechanical Bin Control:<br />

<strong>KM</strong>-320MAH-E and <strong>KM</strong>-<strong>650MAH</strong>-E Auxiliary Code U-1 and Later<br />

<strong>KM</strong>-515MAH-E Auxiliary Code U-2 and Later<br />

See "IV.C.2.a) Mechanical Bin Control Check."<br />

Legend: CB–control board; Comp–compressor; FM–fan motor; F/S–float switch;<br />

HGV–hot gas valve; LLV–liquid line valve (<strong>KM</strong>-515MAH-E); MBC–mechanical<br />

bin control; PM–pump motor; TBC–thermostatic bin control; TXV–thermostatic<br />

expansion valve; WV–inlet water valve<br />

38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!