25.12.2014 Views

Infrastructure Projects Facility Technical Assistance Window (IPF TA ...

Infrastructure Projects Facility Technical Assistance Window (IPF TA ...

Infrastructure Projects Facility Technical Assistance Window (IPF TA ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

landfills; education degree and qualifications for landfill operator; and<br />

types of waste acceptance criteria (Official Gazette GoM, No 84/09 and<br />

46/11 from 16.09.2011)<br />

This Rulebook defines in detail the characteristics of site: geological, hydrological,<br />

morphological, meteorological, seismological etc., construction<br />

conditions, sanitary-technical conditions, operating mode and closure of<br />

landfills, education degree and qualifications for landfill operator, as well<br />

as types of waste and waste acceptance criteria. Some of the Rulebook<br />

provisions defines:<br />

- Waste disposal sites shall be determined based on location and distance<br />

of the site from the structures, visibility of site and environmental<br />

integration, transport lines, transport distances and level of<br />

site-related infrastructure; the possibility of provision of material for<br />

construction of an impermeable layer, drainage and covering; and previous<br />

use of site area.<br />

- Landfill shall be constructed with a minimum distance of 300 m from<br />

inhabited areas and recreation areas, public parks, rehabilitation centres<br />

and resorts and agricultural areas intended for growing fruits and<br />

vegetables; With a minimum distance of 500 m from permanent rivers<br />

and lakes; Is above aquifers or in which water flows from cracks in<br />

rock mass do not fill the landfill area; Is not within Category I, Category<br />

II and Category III of the sanitary protection zone.<br />

- Landfill can be constructed at a site that is provided with a leachate<br />

and gas collection system, and technical solutions for treatment of<br />

leachate and gas to prevent pollution.<br />

- A landfill comprises: landfill body, landfill gas treatment system,<br />

leachate collection basin, leachate treatment and drainage system, external<br />

drainage system for collection of storm water and water resulting<br />

from waste truck-cleaning, waste weighing equipment, waste control<br />

and analysis area and temporary waste storage area.<br />

- Bottom and sides of landfill body shall be lined with a mineral layer<br />

(clay) combined with synthetic materials.<br />

- Surface sealing of landfill body involves placing layers in the following<br />

sequence: highly impermeable mineral layer (clay), impermeable<br />

synthetic material with a protective geo-textile layer drainage layer, 1<br />

m thick top soil cover (re-cultivation layer), and 0.3 m thick humus<br />

layer.<br />

- Other specific Rulebook provision and conditions for Leachate treatment,<br />

landfill gas, protective measures, etc.<br />

5 Regulation on the Waste Recovery and Disposal Facilities (Official<br />

Gazette, GoM, No. 75/10)<br />

.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!