Tailoring of <strong>PRINCE2</strong> (part of PID)<br />

Document: Tailoring of <strong>PRINCE2</strong><br />

Project: Pen Project Author: Project Manager<br />

Date:<br />

1. Adapting the Principles<br />

All <strong>PRINCE2</strong> principles will be fully applied in the project. <br />

2. Adapting the Themes<br />

Build beber relaDonships with clients and reduce the loss in the <br />

renewal of maintenance contracts from 10% to 5%. <br />

CopyWorld365 had 4,200 maintenance contracts with an average <br />

profit of €200 per contract = €840,000. <br />

A 10% loss in contracts is a loss of €84,000 <br />

3. Adapting the Terms<br />

The default <strong>PRINCE2</strong> terminology will be used in the project, except for <br />

the Project Brief, which may also be called “project charter” in some <br />

documents or verbal communicaDons; they will both address the same <br />

management product. <br />

4. Adapting the Management Products<br />

The default <strong>PRINCE2</strong> management products will be kept separated <br />

(each in a single document), with the same default <strong>PRINCE2</strong> product <br />

descripDons, except that: we would not use formal and documented <br />

Work Packages except for those that are handled by a Team manager <br />

other than the Project Manager. Checkpoint Reports would be verbal <br />

too. <br />

5. Adapting the Processes<br />

All <strong>PRINCE2</strong> processes will be kept separated and will be<br />

handled formally.<br />

6. Adapting the Roles<br />

• The same person will handle both the ExecuDve role and represent <br />

the corporate level. <br />

• The Project Assurance and Change Authority roles will be merged <br />

into the Project Board. <br />

• The Project Support role will be handled by the Project Manager. <br />

• The Project Manager will also have the role of Team Manager in <br />

most cases. <br />

Our objec(ve here is to apply the simplest possible -­‐ <br />

yet full -­‐ form of <strong>PRINCE2</strong> so you can view the <br />

majority of <strong>PRINCE2</strong> documents and get a be_er <br />

idea of how a typical midsize project works and see <br />

that all the <strong>PRINCE2</strong> principles are applied. <br />

It’s common for small projects to <br />

handle the Star(ng up a Project <br />

process informally, or to combine it <br />

with Ini(a(ng a Project process; <br />

A small project like this would usually be <br />

tailored differently, but we’ve not <br />

simplified it enough, because we have <br />

demonstra(on purposes. <br />

<strong>PRINCE2</strong>® is a Registered Trade Mark of the AXELOS. The Swirl logo is a Trade Mark of the AXELOS.<br />

© Management Plaza<br />

P2P-<strong>SampleProject</strong>-EN<br />

Version V01.14 – <strong>Premium</strong> Edition<br />

46