Installation & Operation Manual - Phase-A-Matic, Inc.
Installation & Operation Manual - Phase-A-Matic, Inc.
Installation & Operation Manual - Phase-A-Matic, Inc.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 3-12 Battery <strong>Installation</strong><br />
Washers & Nut<br />
Battery Hold Down Bar<br />
(Install away from terminals)<br />
The + and − terminals of your battery may<br />
be different than shown. Be sure that the<br />
Positive lead is connected to the positive<br />
(+) terminal of your battery.<br />
Battery<br />
Washers & Nut<br />
Battery Hold Down Rod<br />
Battery Tray<br />
4. Connect the positive lead to the positive (+) battery terminal.<br />
5. Connect the negative lead to the negative (−) battery terminal.<br />
6. Do not lay tools or metal parts on top of batteries.<br />
7. Connect charging source to the battery terminals.<br />
8. Disconnect the battery’s ground terminal before working in the vicinity of the battery or<br />
battery wires. Contact with the battery can result in electrical shock when a tool<br />
accidently touches the positive battery terminal or wire. The risk of such shock is<br />
reduced when the ground lead is removed during installation and maintenance.<br />
Recommended Engine Oil and Battery Type<br />
When replacing batteries, use only the recommended battery for your generator, see Table 3-5.<br />
Table 3-5 Recommended Engine Oil and Battery Type<br />
MODEL<br />
SUMMER<br />
WINTER<br />
OIL<br />
RECOMMENDED<br />
(AMPS) COLD<br />
OIL<br />
OIL<br />
CAPACITY<br />
BATTERY<br />
CRANKING<br />
AE8 SAE. 30 5W/30 2.2 PTS Interstate SP−40 340<br />
AE10 SAE. 30 5W/30 2.2 PTS Interstate SP−40 340<br />
AE11 SAE. 30 5W/30 2.0 QTS Interstate SP−40 340<br />
AE25 SAE. 30 5W/30 4.5 QTS BCI Group 24 750<br />
MN2415<br />
Receiving & <strong>Installation</strong> 3-15