04.01.2015 Views

Technical Specification for - Gujarat Electricity Board

Technical Specification for - Gujarat Electricity Board

Technical Specification for - Gujarat Electricity Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TECHNICAL SPECIFICATION FOR<br />

SDH/PDH Equipment with integrated Access Multiplexer<br />

No Test Name Description Basic<br />

standard<br />

2.8 Damped oscillatory<br />

waves<br />

AC/DC Power supply:<br />

Common mode<br />

Differential mode<br />

Signal terminals:<br />

Common mode<br />

Differential mode<br />

IEC 61000-4-12<br />

Level<br />

2.50kV<br />

1.25kV<br />

2.50kV<br />

1.25kV<br />

Comply (To be<br />

filled up by<br />

bidder)<br />

2.9 Conducted common<br />

mode disturbance<br />

Telecommunication<br />

ports:<br />

Common mode<br />

1 MHz, 400 Hz repetition<br />

rate, 2 s burst duration<br />

Frequency 50 Hz,<br />

continuous mode<br />

2.50kV<br />

IEC 61000-4-16 10 / 30<br />

Vrms<br />

The bidder shall have to comply <strong>for</strong> all the details asked under Clause 2.2.5.6 (A) & (B)<br />

and 2.2.5.7 (c ) and (d) against each items of tables given above invariably. In case of<br />

non-submission of same with the offer, the bid shall be liable to be rejected.<br />

2.2.5.8 Redundancy Requirements and Protection Schemes<br />

Equipment redundancy and Automatic Protection Schemes (APS) are specified in the<br />

Table 2-1. The failure of one element shall not prevent the use of any other that has<br />

not failed.<br />

Table 2.1<br />

Equipment Redundancy Requirements Summary<br />

Fibre Optic terminal equipment :<br />

SDH STM-1 ADM<br />

Power Supply & Converters<br />

Common Control* Cards<br />

APS<br />

APS<br />

* = Common control cards which are<br />

essentially required <strong>for</strong> operation of<br />

the equipment.<br />

The offered equipment shall support at least SNCP as per standard ITU-T G.841. In<br />

case the equipment offered by the Bidder does not support the above mentioned<br />

minimum protection methods, the bidder shall have to provide all additional equipment<br />

needed to provide same level of flexibility, redundancy and functionality at no additional<br />

cost to Employer. The bidders shall provide details of protection schemes supported in<br />

the Bid document.<br />

The offered equipment shall support automatic switchover function between the<br />

redundant modules and all required modules and hardware to support the automatic<br />

switch over shall be provided by the Contractor.<br />

Sign & Seal of Bidder<br />

GETCO/E/TS-SDH/PDH FOTE/R1, Dt:16.04.2011<br />

Page 31 of 60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!