TECHNICAL SPECIFICATION FOR<br />

SDH/PDH Equipment with integrated Access Multiplexer<br />

event of order bidder shall have to get approval of training<br />

literature/documents from GETCO. The program of the training shall be<br />

mutually discussed and finalized by the purchaser with suppliers.<br />

2.24. SUPERVISORY ERECTION & COMMISSIONING<br />

The Bidder shall depute their Engineer to the various sites <strong>for</strong> carrying out the<br />

installation, testing and commissioning of FOTE & NMS. The purchaser shall<br />

provide an adequate number of skilled/unskilled workers as well as all ordinary<br />

tools and equipment required <strong>for</strong> equipment erection at his (purchaser’s)<br />

expenses.<br />

The installation & commissioning of FOTE equipments will require to be carried<br />

out stage wise depending on the readiness of the transmission lines with<br />

OPGW and building of Sub-stations between which lines will be terminated.<br />

Hence in the context of above bidder shall have to specify the special storage<br />

condition if required.<br />

2.25. SCHEDULES<br />

2.25.1. The bidder shall fill in the following schedules which <strong>for</strong>m part of the bid<br />

specification and offer. If the schedules are not submitted duly filled in with<br />

the offer, the offer is likely to be rejected.<br />

Schedule – A1<br />

Table of Compliance (Clause 2.2.5.6 (A))<br />

Configuration of Different Modules available with offered system (Clause 2.2.5.6<br />

(B))<br />

Schedule – B1<br />

Compliance <strong>for</strong> tests: Immunity of the equipment (substation environment)<br />

(Clause 2.2.5.7 ( c)) and<br />

Compliance <strong>for</strong> tests: Emission of the equipment (substation environment)<br />

(Clause 2.2.5.7 (d))<br />

Schedule – C1 Deviation from <strong>Specification</strong><br />

Schedule – D1 Schedule of Bidder’s experience<br />

Schedule – E1 Schedule to indicate Bidder’s capability<br />

2.25.2. For any deviation from the specification which is not specifically brought out in<br />

the schedules shall be supported by authentic documents, standards and<br />

clarifications; otherwise the offer may be liable <strong>for</strong> rejection. Any deviation from<br />

the specification shall be highlighted giving reasons.<br />

Sign & Seal of Bidder<br />

GETCO/E/TS-SDH/PDH FOTE/R1, Dt:16.04.2011<br />

Page 57 of 60