Technical Specification for - Gujarat Electricity Board
Technical Specification for - Gujarat Electricity Board
Technical Specification for - Gujarat Electricity Board
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TECHNICAL SPECIFICATION FOR<br />
SDH/PDH Equipment with integrated Access Multiplexer<br />
2.26. INFORMATION TO BE FILLED IN INVARIABLY BY THE BIDDER:<br />
For ready reference of the purchaser, the items of in<strong>for</strong>mation required to be<br />
invariably furnished by him in his offer, are listed below:<br />
2.26.1. A copy of the authentic English translation of each of the standards to which<br />
the offered equipment con<strong>for</strong>ms.<br />
2.26.2. Schedule - `A1’ to `E1’.<br />
2.26.3 Documents and drawing listed in Clause no.2.21.<br />
2.26.4. Documents specified in clause no.2.18<br />
2.27 UNIT RATE FOR EACH ITEM OF BOQ.<br />
2.27.1. The bidder has to submit along with their offer unit rate <strong>for</strong> all the items of<br />
FOTE configuration given in Schedule of BOQ including items of spares<br />
and listed SFPs, Wave length converter & booster at clause No. 2.15.<br />
The offers without above unit rate are likely to be rejected.<br />
2.27.2 The above unit rate shall be kept valid till the expiry of guarantee period.<br />
2.28. REQUIREMENT FOR FIRST TESTING AND COMMISSIONING<br />
2.28.1. Any modifications required by the purchaser at site shall be carried out by the<br />
successful bidder at the time of commissioning, free of cost.<br />
2.28.2. The successful bidder has to provide reproducible tracings <strong>for</strong> all the drawings<br />
as a part of supply contract to the CE (Project) GETCO, Corp office,<br />
VADODARA <strong>for</strong> documentation.<br />
2.28.3. The successful bidder has to supply necessary tools/kits accessories required<br />
<strong>for</strong> satisfactory operation of FOTE, as a part of supply contract to each<br />
Consignee / destination.<br />
2.28.4 The successful Bidder has to provide instruction manual, all drawings, literature<br />
etc. <strong>for</strong> all FOTE, write up <strong>for</strong> testing and commissioning procedures, setting<br />
calculations, NMS Documents including operational procedure, digital cross<br />
connection details with time slots and settings adopted <strong>for</strong> individual FOTE as<br />
commissioning document and trouble shooting protocols to all<br />
consignee/destinations as well as to the SE (Telecom), GETCO, and the<br />
CE (Projects) GETCO, HO, VADODARA.<br />
2.28.5. The successful bidder has to do installation, testing/commissioning of each<br />
FOTE configuration offered <strong>for</strong> sub-station, by deputing his Service Engineer.<br />
The 10% value of total Ex-Work price of supply Part-A is to be retained over<br />
and above the money retained as per payment terms of the GETCO and the<br />
same is to be released after satisfactory testing and commissioning of the all<br />
the FOTE & NMS and all other equipments necessary <strong>for</strong> successful<br />
completion of overall network operation.<br />
Sign & Seal of Bidder<br />
GETCO/E/TS-SDH/PDH FOTE/R1, Dt:16.04.2011<br />
Page 58 of 60