TECHNICAL SPECIFICATION FOR<br />

SDH/PDH Equipment with integrated Access Multiplexer<br />

a. Provide tools to establish and maintain the backbone topology and configuration<br />

in<strong>for</strong>mation and provide graphical maps depicting the configurations.<br />

b. Gather descriptive in<strong>for</strong>mation about the current configuration of the equipment,<br />

provide operator displays, and prepare reports.<br />

c. Provide tools <strong>for</strong> planning, establishing, and changing the static equipment<br />

configuration. Provide <strong>for</strong> changes to the equipment configuration in response to<br />

equipment failures, planned upgrades, and operator requests to take equipment<br />

offline <strong>for</strong> testing.<br />

d. Provide verification testing to support new equipment installation.<br />

NMS Configuration<br />

A graphical User Interface should exist to create network Domains, the NEs to be<br />

managed by the system and NE supervision processes. (Domains are used to<br />

structure the network in areas of responsibilities and are used in the definition of<br />

access right. The supervision processes allow grouping the NEs <strong>for</strong> supervision and<br />

enabling the supervision of a group of NEs to be turned to ON or OFF.)<br />

NE Configuration<br />

Once an NE is discovered by the NMS its configuration shall be automatically uploaded<br />

and stored on the NMS hard disk. It shall be possible to configure the NMS to<br />

automatically keep a definable number of the most recent NE configurations accessible<br />

<strong>for</strong> inspection and/or download. All NE configuration changes should be done from the<br />

NMS using easy to use graphical windows accessible via drop down menus starting<br />

from the NE symbol on the graphical network view. The NMS shall fully support the<br />

administration of the NE configuration data (upload, download, backup, copy) and the<br />

NE embedded software (upgrade).<br />

End to End Circuit/Trail Configuration<br />

As an NMS option a facility <strong>for</strong> automated end-to-end configuration of trails and circuits<br />

(trail management) shall be offered including the 64kBit/s cross- connections.<br />

The option shall enable the operator to create and maintain database tables containing<br />

all the communication services configured into the network. A graphical user interface<br />

shall be available to browse, modify or delete the existing end to end connections or to<br />

create new ones. To create new connections it shall be sufficient to specify the type of<br />

connection, the required bandwidth, the protection type and the two end points. The<br />

software should then suggest routes through the network and can be used to<br />

automatically download the required cross-connections to all the NEs which belong to<br />

the selected route.<br />

Trails e.g. at VC4, VC12 or E1 level can be inspected <strong>for</strong> the number of used/free<br />

channels.<br />

Various reports shall be printed and in<strong>for</strong>mation extracted in a <strong>for</strong>mat which is suitable<br />

to be imported into a spread sheet program such as Excel.<br />

2.6.3.2 Fault Management<br />

Sign & Seal of Bidder<br />

GETCO/E/TS-SDH/PDH FOTE/R1, Dt:16.04.2011<br />

Page 39 of 60