19.01.2015 Views

condair sH2

condair sH2

condair sH2

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

33<br />

K<br />

10. Starting from the bottom, install the humidification boxes in each row: Hook the mounting clips<br />

of the boxes into the corresponding openings of the supports, then push the humidification box<br />

downwards until it comes to a stop (arrangement of the humidification boxes according to the<br />

installation drawing included in the delivery).<br />

Note: in ventilation systems with an air speed >4.7 m/s the cover sheet “K” must be mounted<br />

to all topmost humidification boxes before installing them.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!