19.01.2015 Views

Design and Access Statement for a Housing Development at The ...

Design and Access Statement for a Housing Development at The ...

Design and Access Statement for a Housing Development at The ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

D e s i g n<br />

d e s i g n a n d a c c e s s s t a t e m e n t<br />

Householder <strong>Development</strong> - Waste Audit<br />

<strong>The</strong> completed development will gener<strong>at</strong>e normal household waste – a mixture of recyclable <strong>and</strong><br />

non-recyclable m<strong>at</strong>erials. <strong>The</strong> amount of the different waste types will be typical <strong>for</strong> dwellings of this<br />

size, normally requiring one regular <strong>and</strong> one recycling collection every two weeks. <strong>The</strong> proposed<br />

dwellings will have space <strong>for</strong> storage th<strong>at</strong> will enable recycling separ<strong>at</strong>ion be<strong>for</strong>e collection, with<br />

most food <strong>and</strong> wet waste being recycled by composting within the site. All waste collection will be<br />

by the normal Council refuse contractors.<br />

During the construction phase many existing m<strong>at</strong>erials will be reused on site, <strong>and</strong> the n<strong>at</strong>ure of the<br />

development means many recycled building m<strong>at</strong>erials will be imported to ensure m<strong>at</strong>ching<br />

m<strong>at</strong>erials are used. Inert waste m<strong>at</strong>erials gener<strong>at</strong>ed during this phase can be used as hardcore fill <strong>for</strong><br />

the driveway surface. Other waste will be sorted into items th<strong>at</strong> can be recycled (eg. plastics) <strong>and</strong><br />

those th<strong>at</strong> need disposing of with specialist waste companies th<strong>at</strong> have the appropri<strong>at</strong>e licenses <strong>for</strong><br />

waste disposal.<br />

At this stage the an estim<strong>at</strong>e of the likely quantities of waste to be gener<strong>at</strong>ed is not feasible.<br />

Householder <strong>Development</strong> - Waste Management Facilities Str<strong>at</strong>egy<br />

<strong>The</strong> utility room <strong>and</strong>/or kitchen areas will include separ<strong>at</strong>e recycling receptacles. <strong>The</strong> dwellings has<br />

ample room <strong>for</strong> these. External waste bins will be stored with the rear gardens. <strong>The</strong>re will be<br />

inevitable variability during the lifetime of the property of the exact loc<strong>at</strong>ion of bin storage internally<br />

<strong>and</strong> externally.<br />

During the construction phase clear space will be dedic<strong>at</strong>ed to the sorting of waste to enable the<br />

maximis<strong>at</strong>ion of recycling.<br />

H o u s i n g , W a g g o n & H o r s e s , B r i n s l e y<br />

12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!