MODULE 10: INCREASING ACCESS TO ENERGY SERVICES IN RURAL AREAS<br />

page 10.61<br />

Rural electrification criteria<br />

The criteria for <strong>rural</strong> electrification plann<strong>in</strong>g must be developed through a step-by-step<br />

process. An example process of criteria development is presented here:<br />

Step 1: Identification of national development plan priority <strong>areas</strong><br />

Step 2: First pass technology assessment<br />

Step 3: Project cluster<strong>in</strong>g and identification<br />

Step 4: Project prioritisation<br />

Step 5: Regional equity adjustment<br />

Each of these steps has a specific output <strong>in</strong> order <strong>to</strong> facilitate the development of the <strong>rural</strong><br />

electrification plan for the country. A diagram show<strong>in</strong>g the steps and their outputs is given<br />

<strong>in</strong> figure I.<br />

Step 1:<br />

National development plan priority <strong>areas</strong><br />

The first step <strong>in</strong> the process of select<strong>in</strong>g priority <strong>areas</strong> for electrification is <strong>to</strong> identify<br />

regions that have been prioritized for economic development: these may <strong>in</strong>clude special<br />

development zones etc.<br />

These regions are sometimes laid out <strong>in</strong> a country’s National Development Plan and other<br />

national development plann<strong>in</strong>g documents are worth exam<strong>in</strong><strong>in</strong>g such as agricultural development<br />

plans, poverty eradication action plans, etc. From these k<strong>in</strong>ds of documents<br />

priority regions for electrification can be identified such as regional or district headquarters,<br />

regions with many agricultural projects, <strong>areas</strong> with large <strong>in</strong>dustrial loads and trad<strong>in</strong>g<br />

centres.<br />

In addition <strong>to</strong> this, it is essential <strong>to</strong> <strong>in</strong>tegrate the <strong>rural</strong> electrification plann<strong>in</strong>g with the<br />

transmission and distribution network plann<strong>in</strong>g. This requires close cooperation and coord<strong>in</strong>ation<br />

between the Rural Electrification Agency, the M<strong>in</strong>istry <strong>in</strong> question (usually the<br />

M<strong>in</strong>istry of Energy) and the Transmission and Distribution System Opera<strong>to</strong>r.<br />

Step 2:<br />

First pass technology assessment<br />

The first pass technology assessment is an important output of the process of plann<strong>in</strong>g<br />

<strong>rural</strong> electrification. This will provide a map of the country detail<strong>in</strong>g:<br />

• Current and planned electricity transmission and distribution networks;<br />

• Planned future and potential additional generation capacity;<br />

• Unexploited local resources such as small, m<strong>in</strong>i and micro-hydro sites, as well as solar,<br />

w<strong>in</strong>d and biomass resources.