29.01.2015 Views

Managers Report on submissions to the Draft Kilcoole ... - Wicklow.ie

Managers Report on submissions to the Draft Kilcoole ... - Wicklow.ie

Managers Report on submissions to the Draft Kilcoole ... - Wicklow.ie

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kilcoole</strong> Local Area Plan 2008<br />

Manager’s <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

is c. 50% of <strong>the</strong> development capacity of <strong>the</strong> site (c. 19,000sqm). Therefore this policy<br />

does not alter <strong>the</strong> status quo.<br />

2. The submissi<strong>on</strong> c<strong>on</strong>tains a substantial number of errors with regard <strong>to</strong> <strong>the</strong> uses that<br />

were allowable under <strong>the</strong> previous plan. For example, it is put forward that ‘Church’<br />

was ‘Y’ in <strong>the</strong> 2002 plan when in fact is was ‘X’. Similar, it is stated that ‘heavy<br />

vehicle park’ was ‘X’ in <strong>the</strong> previous plan, when it was actually ‘Y’. No fur<strong>the</strong>r<br />

assessment of this part of <strong>the</strong> submissi<strong>on</strong> requires <strong>to</strong> be carr<strong>ie</strong>d out, as it is clearly<br />

err<strong>on</strong>eous.<br />

3. The draft sets out that proposed park is <strong>on</strong>ly <strong>to</strong> be developed and made open <strong>to</strong> <strong>the</strong><br />

public up<strong>on</strong> development of AA3. Part B, Secti<strong>on</strong> 11: Acti<strong>on</strong> Area 3 states, “A public<br />

riverine park shall be provided al<strong>on</strong>g <strong>the</strong> existing stream <strong>on</strong> <strong>the</strong> western boundary of<br />

<strong>the</strong> Acti<strong>on</strong> Area. This public park shall be designated a public park, not exclusive <strong>to</strong><br />

<strong>the</strong> residents of <strong>the</strong> development and shall be maintained open at all times. Suitable<br />

pathways and lighting / furniture shall be provided by <strong>the</strong> developer”<br />

<str<strong>on</strong>g>Managers</str<strong>on</strong>g> Recommendati<strong>on</strong><br />

No change <strong>to</strong> LAP<br />

Submissi<strong>on</strong> no. 35 (mapped)<br />

Sisters of <strong>the</strong> Holy Faith<br />

This submissi<strong>on</strong> relates <strong>to</strong> <strong>the</strong> lands occup<strong>ie</strong>d by <strong>the</strong> Sisters, measuring c. 21.5ha. The<br />

land are currently proposed for CE and OS z<strong>on</strong>ing<br />

It is requested that <strong>the</strong> lands be rez<strong>on</strong>ed as follows:-<br />

1. The area around <strong>the</strong> C<strong>on</strong>vent building (c. 3.3ha) <strong>to</strong> be rez<strong>on</strong>ed RE – existing<br />

residential, <strong>to</strong> reflect its existing use and possible future uses for holiday and<br />

retreat style activit<strong>ie</strong>s<br />

2. Omit <strong>the</strong> proposed new 2ha CE z<strong>on</strong>ing <strong>to</strong> <strong>the</strong> rear of <strong>the</strong> C<strong>on</strong>vent but maintain <strong>the</strong><br />

existing 0.66ha CE area <strong>to</strong> <strong>the</strong> west/south of St. Brigid’s for future expansi<strong>on</strong><br />

3. Rez<strong>on</strong>e c. 3.6ha for residential development (currently proposed for AG z<strong>on</strong>ing)<br />

Manager’s Resp<strong>on</strong>se<br />

1. It is c<strong>on</strong>sidered appropriate <strong>to</strong> retain <strong>the</strong> CE z<strong>on</strong>ing for <strong>the</strong> existing C<strong>on</strong>vent but <strong>to</strong><br />

alter <strong>the</strong> land-use matrix <strong>to</strong> ensure that ‘residential instituti<strong>on</strong>s’ are permissible in<br />

such z<strong>on</strong>es. It is not c<strong>on</strong>sidered appropriate <strong>to</strong> allow for <strong>to</strong>urism or holiday type<br />

uses <strong>on</strong> this z<strong>on</strong>ing but any applicati<strong>on</strong> for such use, where linked <strong>to</strong> <strong>the</strong> overall<br />

use of <strong>the</strong> site as a religious centre, can be c<strong>on</strong>sidered <strong>on</strong> its merits<br />

2. With regard <strong>to</strong> this submissi<strong>on</strong>, and Submissi<strong>on</strong> No.’s 12, 24 & 29, it is<br />

recommended that <strong>the</strong> proposed 2ha CE z<strong>on</strong>ing <strong>to</strong> <strong>the</strong> rear of <strong>the</strong> C<strong>on</strong>vent building<br />

be omitted<br />

3. The populati<strong>on</strong> projecti<strong>on</strong>s set out in <strong>the</strong> draft plan (which accord with <strong>the</strong> County<br />

Development Plan 2004) and <strong>the</strong> calculati<strong>on</strong> of required land z<strong>on</strong>ing are set out in<br />

Secti<strong>on</strong> 7 of Part A of <strong>the</strong> draft plan. The quantity of z<strong>on</strong>ed land required takes<br />

in<strong>to</strong> account <strong>the</strong> 2006 census populati<strong>on</strong>, permissi<strong>on</strong>s granted and c<strong>on</strong>structed<br />

since 2006 and existing permissi<strong>on</strong>s, which have yet <strong>to</strong> begin c<strong>on</strong>structi<strong>on</strong>. These<br />

secti<strong>on</strong>s clearly set out <strong>the</strong> process under which it was determined what land<br />

requirements were needed in order <strong>to</strong> accommodate <strong>the</strong> projected populati<strong>on</strong> in<br />

2016. The calculati<strong>on</strong>s also provide for an “excess fac<strong>to</strong>r” and substantial<br />

“headroom”, given <strong>the</strong> strategic locati<strong>on</strong> of <strong>the</strong> settlement of <strong>Kilcoole</strong>, its<br />

designati<strong>on</strong> as a Small Growth Town I in <strong>the</strong> Regi<strong>on</strong>al Planning Guidelines and<br />

46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!