29.01.2015 Views

Community, Leisure and Cultural Uses (Use Classes D1 and D2)

Community, Leisure and Cultural Uses (Use Classes D1 and D2)

Community, Leisure and Cultural Uses (Use Classes D1 and D2)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

13 Conclusions<br />

13.1 Section 38(6) of the Planning <strong>and</strong> Compulsory Purchase Act 2004, requires proposals to be determined in accordance with<br />

the Development Plan unless other materials considerations indicate otherwise.<br />

13.2 The Statement assesses the Development against the Development Plan <strong>and</strong> other relevant national, regional <strong>and</strong> local<br />

planning policy, including the draft Elephant <strong>and</strong> Castle Supplementary Planning Document / Opportunity Area Planning<br />

Framework which we expect will be adopted by the time of determination <strong>and</strong> will be a significant material consideration.<br />

13.3 The Development is considered to accord with planning policy which endorses the principle of the Site being developed<br />

for high density, residential led mixed-use development.<br />

13.4 The Development will result in the creation of a new urban quarter on an underutilised brownfield site which will act as a<br />

catalyst for further development in the Opportunity Area <strong>and</strong> will contribute significantly to achieving the Council’s<br />

targets in the area. The Development will bring about comprehensive social, physical, economic <strong>and</strong> environmental<br />

regeneration of a strategically important brownfield site.<br />

13.5 This Statement assesses the Development <strong>and</strong> identifies the key benefits associated with it. These are summarised<br />

below:<br />

<br />

<br />

<br />

<br />

<br />

<br />

The mixed use approach to the Development fully accords with the hierarchy of policy <strong>and</strong> guidance associated with<br />

the Site <strong>and</strong> will act as a catalyst for the Council’s wider vision for the Opportunity Area.<br />

The redevelopment of the Site in its central <strong>and</strong> accessible location will make an important contribution to<br />

sustainable mixed use place-making in London <strong>and</strong> will create a new mixed use neighbourhood <strong>and</strong> place that is<br />

distinctive whilst integrated into its surroundings.<br />

The Development will deliver a change on a strategic scale in keeping with its location <strong>and</strong> context as one of<br />

London’s important Opportunity Areas.<br />

The Development is residential-led with related supporting uses <strong>and</strong> will make a substantial contribution to overall<br />

regional housing delivery for central London as well as local housing delivery for the Council.<br />

The Development maximises the amount of residential use on the Site, intensifies the housing provision <strong>and</strong> provides<br />

a substantial level of new private <strong>and</strong> affordable housing in an area with excellent public transport accessibility.<br />

The Development provides a mix of uses that will create a dynamic <strong>and</strong> vibrant urban quarter <strong>and</strong> will result in an<br />

additional 1,200 FTE jobs in the area <strong>and</strong> circa 1,000 construction jobs.<br />

13.6 The likely impacts of the Development have been fully assessed by the Environmental Statement <strong>and</strong> other application<br />

documents <strong>and</strong> any mitigation measures have been identified. The Development is considered to be entirely appropriate<br />

for its location.<br />

13.7 The Development has been the subject of extensive consultation with the Council, the Greater London Authority,<br />

stakeholders, neighbouring boroughs, English Heritage <strong>and</strong> the public. This has resulted in changes to the Development<br />

to take into account the comments received. This process of consultation <strong>and</strong> engagement is on-going.<br />

13.8 The design of the Development responds fully to its setting <strong>and</strong> context <strong>and</strong> the balance of flexibility <strong>and</strong> control that the<br />

Parameter Plans <strong>and</strong> the Design Strategy Document provide is considered to be acceptable for a development of this<br />

scale, complexity <strong>and</strong> likely timescale.<br />

13.9 The Development accords with planning policy <strong>and</strong> will result in a significant <strong>and</strong> beneficial change to this important part<br />

of Southwark <strong>and</strong> London.<br />

42<br />

The Heygate Masterplan Elephant <strong>and</strong> Castle Outline Planning Application March 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!