4 Condition Prior to the commencement <strong>of</strong> the <strong>development</strong>, a detailed remediation<br />

scheme to bring the site to a condition suitable for the intended use by removing<br />

unacceptable risks to human health, buildings and other property and the natural and<br />

historical environment must be prepared, and is subject to the approval in writing <strong>of</strong> the<br />

Local Planning Authority. The scheme must include all works to be undertaken,<br />

proposed remediation objectives and remediation criteria, timetable <strong>of</strong> works and site<br />

management procedures. The scheme must ensure that the site will not qualify as<br />

contaminated land under Part 2A <strong>of</strong> the Environmental Protection Act 1990 in relation<br />

to the intended use <strong>of</strong> the land after remediation.<br />

4 Reason To ensure that risks from land contamination to the future users <strong>of</strong> the land<br />

and neighbouring land are minimised, together with those to <strong>control</strong>led waters,<br />

property and ecological systems, and to ensure that the <strong>development</strong> can be carried<br />

out safely without unacceptable risks to workers, neighbours and other <strong>of</strong>fsite<br />

receptors in accordance with PPS23 Planning and Pollution Control.<br />

5 Condition The approved remediation scheme must be carried out in accordance with<br />

its terms prior to the commencement <strong>of</strong> <strong>development</strong> other than that required to carry<br />

out remediation, unless otherwise agreed in writing by the Local Planning Authority.<br />

The Local Planning Authority must be given two weeks written notification <strong>of</strong><br />

commencement <strong>of</strong> the remediation scheme works.<br />

Following completion <strong>of</strong> measures identified in the approved remediation scheme, a<br />

verification report (referred to in PPS23 as a validation report) that demonstrates the<br />

effectiveness <strong>of</strong> the remediation carried out must be produced, and is subject to the<br />

approval in writing <strong>of</strong> the Local Planning Authority.<br />

5 Reason To ensure that risks from land contamination to the future users <strong>of</strong> the land<br />

and neighbouring land are minimised, together with those to <strong>control</strong>led waters,<br />

property and ecological systems, and to ensure that the <strong>development</strong> can be carried<br />

out safely without unacceptable risks to workers, neighbours and other <strong>of</strong>fsite<br />

receptors in accordance with PPS23 Planning and Pollution Control.<br />

6 Condition No <strong>development</strong> shall take place until full details <strong>of</strong> both hard and s<strong>of</strong>t<br />

landscape works have been submitted to and approved in writing by the Local<br />

Planning Authority. These details shall include finished levels or contours, hard<br />

surface materials, boundary treatments, refuse or other storage units, street furniture,<br />

structures and other minor artefacts. S<strong>of</strong>t landscape works shall include planting<br />

plans, written specifications (including cultivation and other operations associated with<br />

plant and grass establishment) schedules <strong>of</strong> plants noting species, plant sizes and<br />

proposed numbers and densities where appropriate.<br />

6 Reason To ensure that the <strong>development</strong> is properly landscaped in the interests <strong>of</strong> the<br />

visual amenities <strong>of</strong> the locality.<br />

7 Condition All hard and s<strong>of</strong>t landscape works shall be carried out in accordance with the<br />

approved details. The works shall be carried out prior to the occupation or use <strong>of</strong> any<br />

part <strong>of</strong> the <strong>development</strong> or in accordance with a programme to be agreed in writing<br />

with the Local Planning Authority. Any trees or plants that within a period <strong>of</strong> 5 years<br />

from the completion <strong>of</strong> the <strong>development</strong> die, are removed or become seriously<br />

damaged or diseased, shall be replaced in the next planting season with others <strong>of</strong><br />

similar size and species as those originally planted, unless the Local Planning<br />

Authority gives written approval to any variation.<br />

7 Reason To ensure that the work is carried out within a reasonable period.<br />

09/00558/FM Development Control Board<br />

6 th July 2009