General Aviation Precinct<br />

There has been a very significant increase in vehicle traffic<br />

into the General Aviation Precinct in the past five years due<br />

to the growth in fly-in/fly-out services for the resources<br />

sector. This activity peaks in the early morning and late<br />

afternoon. This area becomes badly congested as there is<br />

only one road in and out of the precinct.<br />

To address this congestion it is necessary to improve the<br />

connections between the precinct and Great Eastern<br />

Highway. Options in this regard that are being discussed<br />

with MRWA include:<br />

• Upgrading the Great Eastern Highway/Fauntleroy<br />

intersection which will also improve access to the<br />

Domestic Precinct and the General Aviation Precinct.<br />

• Extending Bungana Avenue to a new T-intersection<br />

on Kalamunda Road to improve the traffic flow in the<br />

precinct and reduce demand on Fauntleroy Avenue<br />

and its intersection with Great Eastern Highway.<br />

International Terminal Precinct<br />

The main access to the International Precinct is Horrie Miller<br />

Drive which intersects with Tonkin Highway and Kewdale<br />

Road. Secondary access to the precinct is available via Grogan<br />

and Abernethy Roads. A further link, Hudswell Road, which<br />

is under construction, will also connect Abernethy Road to<br />

Horrie Miller Drive.<br />

Currently traffic congestion on Tonkin Highway during the<br />

metropolitan peak hours causes significant delays to traffic<br />

using the highway and in turn to traffic accessing and<br />

leaving the airport. This is currently resulting in a poor initial<br />

impression for international visitors arriving in Perth on the<br />

flights arriving between 3.00pm and 5.00pm.<br />

A number of interim projects are in progress that will<br />

provide modest short-term improvements to the congestion<br />

experienced daily on Horrie Miller Drive at the Tonkin Highway<br />

intersection. These include construction of a second right turn<br />

lane for traffic exiting the airport and heading north on Tonkin<br />

Highway and an extended left turn lane for traffic leaving the<br />

airport and heading south. These works will be completed<br />

during <strong>2009</strong>.<br />

Traffic modelling undertaken to date indicates that the<br />

primary passenger access to the Consolidated Airport Precinct<br />

in the ultimate development will be from a new connection<br />

from the Tonkin/Leach Highway interchange. Horrie Miller<br />

Drive will be the primary access from Kewdale Road and<br />

Tonkin Highway to the non-aeronautical developments that<br />

are located along Horrie Miller Drive thus separating heavier<br />

industrial vehicles from passenger vehicles. The modelling<br />

undertaken to date is preliminary and WAC will continue<br />

to work closely with MRWA to progress the design of the<br />

connections between the airport and Tonkin Highway.<br />

While the extension of Leach Highway into the airport estate<br />

has been shown on Figure 8.2, the alignment north of the<br />

intersection/interchange at Tonkin Highway is only indicative.<br />

Design of the traffic pattern in the Consolidated Terminal<br />

Precinct, access to the extensive parking structures and the<br />

various constraints associated with road construction in the<br />

approach to Runway 03L/21R will all need to be taken into<br />

account when finalising this alignment.<br />

It is clear however that to cater for the predicted traffic volumes<br />

the final alignment will need to differ significantly from that<br />

previously identified in the <strong>Master</strong> <strong>Plan</strong> 2004. Provision of<br />

a systems interchange at the junction of Tonkin and Leach<br />

Highways as the primary road access to the Consolidated<br />

Terminal area will also require additional airport land to be<br />

set aside for surface access than was previously envisaged.<br />

Commercial Precincts<br />

Access to Commercial Precinct 1 is currently provided by<br />

Brearley and Fauntleroy Avenues, both connecting with<br />

Great Eastern Highway and indirectly to Tonkin Highway. The<br />

existing Great Eastern Highway/Tonkin Highway Southbound<br />

off-ramp/Brearley Avenue is heavily congested during peak<br />

periods and is expected to further deteriorate as traffic<br />

volumes grow.<br />

The congestion in this area will be relieved over time<br />

as domestic services are progressively relocated to the<br />

International Terminal Precinct. Ultimately, access to this area<br />

will be gained primarily from a new interchange connecting<br />

Boud Avenue to Tonkin Highway.<br />