P E R T H A I R P O R T M a s t e r P l a n 2 0 0 9<br />

• runway dimensions and allocation to respective operations;<br />

• flight track descriptions and flight track dispersal to take<br />

into account the spread on the track by aircraft operations;<br />

• aircraft destinations or origins (stage lengths) to take into<br />

consideration track allocation;<br />

• day/night split of operations;<br />

• terrain data; and<br />

• normalised wind velocity and temperature information.<br />

Noise abatement procedures restricting the use of the<br />

06/24 runway over more densely populated suburbs to the<br />

southwest of Perth Airport have formed the basis for runway<br />

usage since the 1980’s. In 1999, these noise abatement<br />

procedures were agreed in principle by the Perth Airport<br />

Municipalities Group and are specified in a formal Deed of<br />

Agreement between the City of Bayswater and WAC. The<br />

Deed reaffirms a commitment that the proposal to extend the<br />

06/24 runway to the north east will include the adoption of<br />

strict and explicit use procedures such that take-offs to and<br />

landings from the southwest will only occur:-<br />

- in emergencies;<br />

- in extreme weather conditions; or<br />

- through the loss of the use of runway 03/21; and<br />

• noise abatement procedures and current runway approach<br />

(06) and take-off paths (24) for aircraft greater than<br />

20,000 kilograms would be maintained in the event of the<br />

extension of the 06/24 runway.<br />

• airport information publications will reflect the operating<br />

procedures and restrictions set out above and will be<br />

incorporated in future approved <strong>Master</strong> <strong>Plan</strong>s.<br />

• take-off and approach noise abatement procedures will be<br />

reviewed and improved as appropriate for runway 06/24.<br />

The flight tracks used in the production of the ultimate<br />

capacity ANEF are shown at Figure 11.2.<br />

A 2007 ANEI has been produced for Perth Airport (see Figure<br />

11.3). The ANEI drawing shows noise exposure contours<br />

based on actual aircraft movement data and shows the<br />

average daily aircraft noise exposure around the airport for<br />

the year 2007. Australian Noise Exposure Index plans are<br />

used principally as benchmarks or indicators of change of<br />

aircraft noise exposure. The extent of the ANEI contours on<br />

the 2007 drawing has increased from the ANEI produced in<br />

2002 due to an increase in aircraft movements.<br />

It should also be recognised that the 2002 ANEI was<br />

abnormally affected by a reduction in traffic due to events<br />

such as the Asian financial crisis, Middle East conflicts,<br />

collapse of Ansett, September 11 2001, the Bali bombing and<br />

SARS events.<br />

It should be noted that there can be significant confusion in the<br />

community about the meaning of ANEF or ANEI contours as<br />

they do not represent the noise impact of a single aircraft but<br />

a combination of aircraft. To assist members of the community<br />

to understand how aircraft noise directly affects them, other<br />

indicators have been developed to provide more meaningful<br />

aircraft noise information. This information is published in<br />

Perth Airport’s Annual Environment Report and includes:<br />

• flight path maps;<br />

• track density plots;<br />

• flight path movements; and<br />

• decibel charts.<br />

11.4 Land Use Development in the<br />

Vicinity of Perth Airport<br />

As outlined in Chapter 4 the ANEF produced in accordance<br />

with the requirements of the Airports Act 1996, for<br />

Perth Airport has been incorporated into State <strong>Plan</strong>ning<br />

Regulations. This measure helps to provide Perth Airport<br />

and the surrounding community with protection from<br />

inappropriate development in areas within the ultimate<br />

development noise exposure contour for the airport.<br />

The inclusion of the ultimate development ANEF (based on<br />

350,000 movements) in the state planning policy represents<br />

a major step forward in ensuring that long-term development<br />

of the airport is compatible with the long-term development<br />

of land surrounding the airport. This achieves the desired<br />

outcome of adopting the ANEF system for land use planning<br />

around airports.<br />