24.04.2015 Views

PERTH AIRPORT Master Plan 2009

PERTH AIRPORT Master Plan 2009

PERTH AIRPORT Master Plan 2009

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

P E R T H A I R P O R T M a s t e r P l a n 2 0 0 9<br />

The Airports Act 1996 requires Perth Airport to review its <strong>Master</strong> <strong>Plan</strong> every five years; hence the <strong>Master</strong> <strong>Plan</strong> <strong>2009</strong> is based on a<br />

review of the <strong>Master</strong> <strong>Plan</strong> 2004.<br />

While Perth Airport’s <strong>Master</strong> <strong>Plan</strong> is an accurate description of the status of planning at the date of publication, Perth Airport’s<br />

management processes involve continuous review of plans reflecting that the factors impacting the airport, including demand for<br />

services, are dynamic.<br />

4.3 Perth Airport <strong>Plan</strong>ning Framework<br />

Given the critical role effective planning plays in ensuring the facilities at Perth Airport meet the public’s interests, WAC devotes<br />

significant resources to planning. Westralia Airports Corporation has an integrated planning framework that seeks to ensure that<br />

the interrelationships between the various plans are properly defined, assessed and incorporated into plans. The following flow<br />

chart provides a general description of WAC’s integrated planning framework.<br />

Figure 4.1 Perth Airport Integrated <strong>Plan</strong>ning Framework<br />

Strategic Business<br />

<strong>Plan</strong><br />

Surrounding Area<br />

Land Uses (including<br />

interface with Local<br />

and State Government)<br />

Ultimate Airport<br />

<strong>Master</strong> <strong>Plan</strong><br />

Environment<br />

Strategy<br />

<strong>Master</strong> <strong>Plan</strong><br />

Sustainability<br />

Strategy<br />

Celebrating<br />

Aboriginal Culture<br />

at Perth Airport<br />

Surface Access<br />

<strong>Plan</strong>s<br />

Infrastructure <strong>Plan</strong>s<br />

Power<br />

Water<br />

Sewage<br />

Drainage<br />

Road / Rail<br />

Communications<br />

precinct<br />

Development<br />

<strong>Plan</strong>s<br />

Development<br />

<strong>Plan</strong>s<br />

Interface with Local<br />

and State Government<br />

and infrastructure<br />

providers<br />

Site<br />

Development<br />

<strong>Plan</strong>s<br />

28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!