STEAM GENERATOR & FLUID HEATER<br />

INSTALLATION MANUAL<br />

C. Water Treatment Skid All water treatment components are mounted on a skid and<br />

provided along with the steam generator. Components include receiver, softeners, chemical<br />

pumps, blowdown tank, control box, and booster pumps if applicable. Skid piping and electrical<br />

interconnections between the skid components are included.<br />

NOTE<br />

All <strong>Clayton</strong>-supplied water skids must be fully grouted in place once leveling<br />

and anchoring are complete.<br />

D. <strong>Generator</strong> Skid The steam generator(s) and water treatment components as listed in<br />

“C” above, are all mounted on a single skid. Skid piping and electrical interconnections between<br />

components are included.<br />

NOTE<br />

On SCR system skids, the SCR is mounted and piped, but removed for<br />

shipment for reassembly by the installing contractor.<br />

NOTE<br />

<strong>Clayton</strong> reserves the right to ship loose any equipment that cannot be safely<br />

shipped or installed. Some skid components may require re-installation<br />

on site.<br />

NOTE<br />

All <strong>Clayton</strong>-supplied water skids must be fully grouted in place once leveling<br />

and anchoring are complete.<br />

E. <strong>Clayton</strong> Feedwater Pump Skids <strong>Clayton</strong> feedwater pumps are designed to fulfill the<br />

needed water volume and water pressure requirements of the heating unit. These pumps are<br />

mounted on a skid frame that includes all the equipment needed to operate the pump, such as<br />

motors and oil pumps. These feedwater pump skids are standard equipment for all steam generators<br />

and fluid heaters. Piping, piping assemblies, valves, and other plumbing components connecting<br />

the feedwater pump skid and the heating unit are supplied by <strong>Clayton</strong>.<br />

Water supply piping to the feedwater pump skid are the responsibility of the installer, with<br />

the exception of a generator skid. On generator skids, water supply piping to the feedwater pump<br />

skid are part of the generator skid package. For determining the proper water supply pipe sizing,<br />

see Section 2.12.<br />

F. <strong>Clayton</strong>-RotoJet Feedwater Pump Skids Because of the size requirements of this<br />

centrifugal-style feedwater pump, this feedwater pump skid must be installed independent of any<br />

water skid package that <strong>Clayton</strong> offers. For customer connection requirements, see Table 3-1.<br />