14 Systems<br />

The systems of the <strong>Vendetta</strong> will closely follow the design architecture of the F-22; however, technology<br />

advances by 2020 will render most of the electronics aboard the F-22 antiquated, thus the next generation of this system<br />

should be implemented. Design trades on communications, processor I/O (such as unified vs. federated), system<br />

redundancy, and actuation will have to be performed on the new system.<br />

14.1 Auxiliary Power Generation System<br />

The auxiliary power generation<br />

system consists of two components: an<br />

auxiliary power unit (APU) and a selfcontained<br />

energy storage system (SES). The<br />

RFP lists a GFE APU but the cost, volume,<br />

and weight listed suggests that it is actually a<br />

Ram Air Turbine (RAT). The RAT was<br />

Table 14.I – APU Selection Table<br />

Company Model<br />

Startup<br />

Ceiling<br />

Dry<br />

Weight Rating Power/Weight<br />

ft lb Hp Hp/lb<br />

Honeywell 131-9A 41000 350 460 1.31<br />

Honeywell 36-300 35000 300 390 1.3<br />

Honeywell 331-200 43000 500 579 1.16<br />

Pratt and<br />

Whitney PW901 25000 835 1535 1.84<br />

Sundstrand APS2100 37000 270 504 1.87<br />

Sundstrand APS3200 39000 305 603 1.98<br />

eliminated due to the need for ground power (RFP specifies the aircraft must operate with minimal ground support) and<br />

previous service experience showing the unreliability of RATs in supersonic aircraft. APU selection involved examining<br />

a number of mid-sized gas turbine generators with output exceeding the estimated minimum 350 Hp required by the<br />

<strong>Vendetta</strong>. A shortened list of APU candidates appears in Table 14.I.<br />

Due to common unreliability of in-flight APU startup, startup ceiling was not seen as a major driver in APU<br />

selection. Overall high power to weight ratio as well as a rating above 350 Hp and small size was seen as the main APU<br />

selection criteria. With this in mind the Sundstrand APS<br />

3200 was selected. By the RFP 2010 cutoff data a new<br />

APU may become available; therefore the Sundstrand is<br />

mainly used for sizing considerations rather than a<br />

definite APU for the vendetta. Placement of the APU<br />

can be seen in Figure 14.1 and Foldout 4.<br />

Modern designs utilize a SES for power backup<br />

Figure 14.1 - APU Placement<br />

due to its high reliability, invulnerability to aircraft<br />

attitude and airspeed. The SES is a design point to be focused on in the next level of design. Current hypergolically<br />