07.07.2015 Views

SOW Attachment D Epoxy Coating System Used on Hangar Floor

SOW Attachment D Epoxy Coating System Used on Hangar Floor

SOW Attachment D Epoxy Coating System Used on Hangar Floor

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix D Existing <str<strong>on</strong>g>Epoxy</str<strong>on</strong>g> <str<strong>on</strong>g>Coating</str<strong>on</strong>g> <str<strong>on</strong>g>System</str<strong>on</strong>g> DataPREPARATIONDetergent scrub and rinse with clean water to removesurface dirt, grease, oil and c<strong>on</strong>taminants.Steel Shot Blast (minimum shot size of 330): Use magneticbroom to remove excess shot, sweep to remove large debrisand vacuum to remove fine dust.Scarify: Sweep to remove large debris and vacuum toremove fine dust.Key in all terminati<strong>on</strong> points.JOINTS: Cracking of the resurfacer will occur over joints thatare overlayed and later move. Because resurfacers are notflexible, joints that might move should be h<strong>on</strong>ored (cut) afterthe installati<strong>on</strong> and filled with an appropriate material.Depending <strong>on</strong> the preference of the facility owner, joints mayor may not be filled. If the joints are filled, n<strong>on</strong>-moving joints,i.e. c<strong>on</strong>tracti<strong>on</strong> or c<strong>on</strong>trol joints, can be hard filled withthickened, 100% solids epoxy or with a semi-rigid joint fillersuch as Eco-PJS or Eco-EJF. C<strong>on</strong>structi<strong>on</strong> joints lessthan <strong>on</strong>e inch wide may also be filled withEco-PJS. Isolati<strong>on</strong> or expansi<strong>on</strong> joints must be filled with aflexible material designed for this purpose. <str<strong>on</strong>g>Coating</str<strong>on</strong>g> appliedover filled joints will crack if there is c<strong>on</strong>crete movement.APPLICATION - PRIMEREco-PT 250 is applied over Eco-MPE primer that is still wetor sticky--within 4 hours. It is critical that all c<strong>on</strong>crete iscovered to ensure proper adhesi<strong>on</strong> of the overlay. (See Eco-MPE Product Bulletin for applicati<strong>on</strong> instructi<strong>on</strong>s.)NOTE: The kits come with enough Eco-MPE to prime at180-220 sq. ft. per gall<strong>on</strong> (4.4-5.4 m 2 per litre) for ¼”(6.35 mm) Eco-PT 250 applicati<strong>on</strong>s. If Eco-PT 250 is beingput down at 3/16" (4.76 mm) and/or the floor is extremelyporous or rough, additi<strong>on</strong>al primer will be needed.APPLICATION - OVERLAYCOVERAGE RATE will depend up<strong>on</strong> thickness. A three bagmix of Eco-PT 250 will nominally cover (finished floor):56 ft 2 (5.2 m 2 ) @ 1/4" (6.35 mm)70 ft 2 (6.5 m 2 ) @ 3/16" (4.76 mm)COLORS: Premix Tennant Colorant before adding toEco-PT 250 to ensure uniform color. Add colorant toEco-PT 250 Part A and mix using a Jiffy® mixer blade andslow speed drill.POUR PART C into the mortar mixer. Begin mixing.ADD PART B (1 qt / (0.95 litres) TO PART A (1.25 gal /4.73 litres). POTLIFE: Mix <strong>on</strong>ly enough material which canbe screeded and troweled in a 15 minute period.MIX FOR 1 MINUTE or until thoroughly mixed using theJiffy® mixer blade and slow speed drill.POUR THE MIXED PARTS A&B into the mortar mixer. Mixuntil uniform (approximately <strong>on</strong>e minute). The resin needs to<strong>on</strong>ly wet out the sand.POUR THE MIXED MATERIAL into the screed box. Toachieve a 1/4" (6.35 mm) finished floor, set the screed box at5/16" (7.94 mm). For a 3/16" (4.76 mm) floor, set the screedbox at 1/4" (6.35 mm). If the material is too thick, it will bemore difficult to level.USE HAND TROWELS for edges and touch up.POWER TROWEL MATERIAL to compact and achievefinished texture as so<strong>on</strong> as possible with an epoxy powertrowel (

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!