Light Duty Technology Cost Analysis, Power - US Environmental ...
Light Duty Technology Cost Analysis, Power - US Environmental ...
Light Duty Technology Cost Analysis, Power - US Environmental ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Item<br />
baseline subsystem. The refrigeration/air conditioning subsystem for the Fusion HEV also<br />
saw an increase in cost of $167.54 over the base Fusion. The incremental increase was<br />
primarily driven by the higher direct manufacturing cost of the electric air conditioning<br />
(AC) compressor ($251.30) over the mechanical driven AC compressor ($83.75). The net<br />
incremental, direct manufacturing cost of the climate control system for the Fusion HEV<br />
over the base Fusion was $213.46; reference Table D-9 and Section H, Appendix A for<br />
additional details.<br />
Table D-9: Net Incremental Direct Manufacturing <strong>Cost</strong> of Ford Fusion HEV<br />
Climate Control System in Comparison to Ford Fusion Base Climate<br />
Control System<br />
120000 Climate Control<br />
Material Labor Burden<br />
End Item<br />
Scrap<br />
SG&A Profit ED&T-R&D<br />
1 02 Heating Defrosting Subsystem $ 27.27 $ 5.53 $ 5.27 $ 38.07 $ 0.27 $ 2.89 $ 3.11 $ 1.43 $ 7.69 $ 0.15 $ 45.91<br />
2 03 Refrigeration/Air Conditioning Subsystem $ 148.86 $ 23.86 $ 43.32 $ 216.04 $ 1.85 $ 14.57 $ 13.38 $ 5.46 $ 35.25 $ - $ 251.30<br />
Item<br />
120000 Climate Control<br />
1 02 Heating Defrosting Subsystem<br />
$ 176.13 $ 29.38 $ 48.59 $ 254.11 $ 2.12 $ 17.46 $ 16.48 $ 6.89 $ 42.95 $ 0.15 $ 297.21<br />
Material Labor Burden<br />
End Item<br />
Scrap<br />
SG&A Profit ED&T-R&D<br />
2 03 Refrigeration/Air Conditioning Subsystem $ 24.10 $ 19.18 $ 25.92 $ 69.20 $ 0.58 $ 6.52 $ 5.56 $ 1.89 $ 14.56<br />
$ 83.75<br />
Item<br />
SYSTEM & SUBSYSTEM DESCRIPTION<br />
120000 Climate Control<br />
System/Subsystem Description<br />
SYSTEM ROLL-UP<br />
SYSTEM & SUBSYSTEM DESCRIPTION<br />
System/Subsystem Description<br />
SYSTEM ROLL-UP<br />
$ 24.10 $ 19.18 $ 25.92 $ 69.20 $ 0.58 $ 6.52 $ 5.56 $ 1.89 $ 14.56 $ - $ 83.75<br />
SYSTEM & SUBSYSTEM DESCRIPTION INCREMENTAL COST TO UPGRADE TO NEW TECHNOLOGY PACKAGE<br />
System/Subsystem Description<br />
Material Labor Burden<br />
1 02 Heating Defrosting Subsystem $ 27.27 $ 5.53 $ 5.27 $ 38.07 $ 0.27 $ 2.89 $ 3.11 $ 1.43 $ 7.69 $ 0.15 $ 45.91<br />
2 03 Refrigeration/Air Conditioning Subsystem $ 124.76 $ 4.68 $ 17.40 $ 146.85 $ 1.27 $ 8.04 $ 7.82 $ 3.57 $ 20.70 $ - $ 167.54<br />
SYSTEM ROLL-UP<br />
Manufacturing<br />
Manufacturing<br />
Manufacturing<br />
NEW TECHNOLOGY GENERAL PART INFORMATION:<br />
2010 Ford Fusion HEV, 2.5L Atkinson Cycle, I4, 156hp (191 Net),<br />
(NiMH Battery 275V, Nominal Pack Capacity 5.5Ah, 1.51kWh)<br />
Total<br />
Manufacturing<br />
<strong>Cost</strong><br />
(Component/<br />
Assembly)<br />
BASE TECHNOLOGY GENERAL PART INFORMATION:<br />
2010 Ford Fusion SE, 3.0L V6, 4-Val. DOHC, NA, PFI, 240hp, 223lb*ft<br />
Total<br />
Manufacturing<br />
<strong>Cost</strong><br />
(Component/<br />
Assembly)<br />
Total<br />
Manufacturing<br />
<strong>Cost</strong><br />
(Component/<br />
Assembly)<br />
End Item<br />
Scrap<br />
Total Markup<br />
<strong>Cost</strong><br />
(Component/<br />
Assembly)<br />
Markup Total Markup<br />
<strong>Cost</strong><br />
(Component/<br />
SG&A Profit ED&T-R&D Assembly)<br />
Total<br />
Packaging<br />
<strong>Cost</strong><br />
(Component/<br />
Assembly)<br />
Total<br />
Packaging<br />
<strong>Cost</strong><br />
(Component/<br />
Assembly)<br />
Net Component/<br />
Assembly <strong>Cost</strong><br />
Impact to OEM<br />
Net Component/<br />
Assembly <strong>Cost</strong><br />
Impact to OEM<br />
$ 152.04 $ 10.21 $ 22.67 $ 184.91 $ 1.53 $ 10.94 $ 10.93 $ 5.00 $ 28.39 $ 0.15 $ 213.46<br />
Markup<br />
Markup<br />
Total Markup<br />
<strong>Cost</strong><br />
(Component/<br />
Assembly)<br />
Total<br />
Packaging<br />
<strong>Cost</strong><br />
(Component/<br />
Assembly)<br />
Net Component/<br />
Assembly <strong>Cost</strong><br />
Impact to OEM<br />
108