10.07.2015 Views

Biennial Report 2005-2007 - Saha Institute of Nuclear Physics

Biennial Report 2005-2007 - Saha Institute of Nuclear Physics

Biennial Report 2005-2007 - Saha Institute of Nuclear Physics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8 Facilities8.1 Electronics Workshop FacilityWorks on Human Resource DevelopmentSenior engineering (Electronics, Electrical and Instrumentation) students <strong>of</strong>ten request the Director-SINP for vocational training and a large number <strong>of</strong> students have been trained since the inception<strong>of</strong> EWF. Several students from different engineering colleges have been trained during <strong>2005</strong>-<strong>2007</strong>,and some <strong>of</strong> them have completed small design works including fabrication and testing <strong>of</strong> the units.The staff members <strong>of</strong> EWFWorks done for the Muon Arm Project [MAP]The details <strong>of</strong> developmental, fabrication and installation works related to MAP are indicatedelsewhere in the Annual <strong>Report</strong>, and the following are some major works done mainly by the staff<strong>of</strong> EWF:•Development <strong>of</strong> Exit board PCBs including layout design using Protel DXP CAD, supervisionduring fabrication at a factory in Hyderabad, testing and validation <strong>of</strong> assembled PCBs and correction<strong>of</strong> all faults caused during fabrication, assembling and transportation to CERN, Geneva.•Fabrication <strong>of</strong> 2.5 Volts & 3.3 Volts PSU for testing and validating exit boards with pre-productionMANU-cards fixed on them.•Fabrication <strong>of</strong> preamplifier and associated circuits planned to be used in wire tension monitor.•Fabrication <strong>of</strong> PCBs used as Dummy Bridge boards for internal connection <strong>of</strong> fragmented exitboards.•Fabrication and assembling <strong>of</strong> components in Low Voltage Boxes for connecting power cables tothe muon detectors, and other several associated jobs related to fabrication <strong>of</strong> muon detectors.•Fabrication and assembling <strong>of</strong> Low Voltage BUS [LVBUS] bars for ten numbers <strong>of</strong> muon detectors.•Developing data base for sorting <strong>of</strong> the test report <strong>of</strong> 2500 numbers MANU cards, and sorting <strong>of</strong>received MANU cards according to the gain spread.•Assisting the MAP-team during validation and installation <strong>of</strong> detectors in Station 2 <strong>of</strong> ALICE[CERN, Geneva].The staff member <strong>of</strong> EWF and some member <strong>of</strong> the MAP-team275

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!