Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DELTABOOSTER_GB01<br />
Trouble-shooting<br />
To ensure a problem-free operation, the following requirements must be fulfilled:<br />
1. Machine and pipeline must be free of air and tight.<br />
2. The water temperature must not exceed 80°C.<br />
3. The water must be without any impurities as for instance running sands > 50 µ.<br />
4. The water supply must always be sufficient.<br />
5. The ambient temperature must not exceed 40°C.<br />
6. Variations in the mains voltage must be max. ±10% of the rated value.<br />
D<br />
Functional Requirements<br />
If the above-mentioned requirements are met, it must be possible, at any time, to tap off 17 l/min. x<br />
the number of pumps under a steady pressure of 160 bar (120 bar in the case of reduced plants)<br />
on a pipeline connected to a DELTABOOSTER and equipped with original standard nozzles.<br />
If these requirements are met and you still experience operational break-downs, there are faults<br />
on the system.<br />
1