10.07.2015 Views

Conceptual Site Model - Argonne National Laboratory

Conceptual Site Model - Argonne National Laboratory

Conceptual Site Model - Argonne National Laboratory

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WVDP Phase 1 CSAP3.0 ORGANIZATION, RESPONSIBILITIES, AND DOCUMENTATION3.1 OrganizationCSAP activities will be managed in accordance with Department of Energy (DOE) requirements.Necessary data collection tasks will be defined and scheduled. Appropriate schedules will bedeveloped for this purpose, such as a long-term schedule, short-term schedules, and plans-of-theweek.NRC will be provided copies of these schedules for information. Implementing plans willbe prepared as necessary in support of the work.3.2 ResponsibilitiesDOE will employ a characterization contractor to accomplish the planned Phase 1 data collectionactivities, including those contained in this plan as well as those specified by the FSSP. Thecharacterization contractor will be responsible for developing and implementing task-specificwork plans that are consistent with the CSAP and the preparation of data packages and summaryreports as deliverables for completed tasks. DOE will provide task-specific work plans andresulting data packages and reports to the NRC as work progresses. DOE and/or its contractorswill maintain an administrative record of characterization activities, including electronic andhardcopy documents, data sets, and related information such as maps, diagrams, geologic logs,field notebooks, and photographs.3.3 DocumentationPrior to the initiation of Phase 1 CSAP activities, the characterization contractor will develop aHASP and Quality Assurance Project Plan (QAPP) applicable to the proposed Phase 1 CSAPwork.Field data collection activities will be initiated through the use of DOE-issued technical taskorders. These technical task orders may be area-specific (e.g., implement pre-remediation datacollection necessary for WMA 10) or goal-specific (e.g., complete buried infrastructure inventoryfor the WVDP premises). In either case, any task order requiring field data collection will beaccompanied by a field sampling plan (FSP). Field sampling plans will provide details aboutRev. 1 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!