Commissioning and operationRaw water pumpDo not let raw water pump run dry.Make sure that all valves / cocks in theraw water circuit are open.If there is a risk of frost, drain the raw waterpump.Filling with engine oilCaution:Do not add so much engine oilthat the oil level rises above themax. marking on the dipstick.Overfilling will result in damage tothe engine.The engines are as a rule supplied withoutoil.Pour oil into engine via filler neck (arrow),see page 51.For the quantity required see “TechnicalData”.17