DGMM-KP/Protective work/<strong>Tender</strong>-08(II)/2012-13<br />
iv. In case of slow progress of the work <strong>in</strong> a section which have been<br />
awarded to a particular contractor, and the public <strong>in</strong>terest does not<br />
permit extension of time limit <strong>for</strong> completion of work, the Deputy General<br />
Manager will have the full right to order that the scope of the contractor<br />
may be restricted to such fraction of the whole of the work and get the<br />
balance executed at the risk and cost of the contractor. All such<br />
payments shall be recovered from the contractor’s pend<strong>in</strong>g bills or<br />
security deposit.<br />
v. The Deputy General Manager (Ma<strong>in</strong>tenance) reserves the right to cancel<br />
the contract and <strong>for</strong>feit the security deposit if the contractor fails to<br />
commence the work with<strong>in</strong> 7 days after issue of the work order.<br />
b) Penalty <strong>for</strong> caus<strong>in</strong>g <strong>in</strong>convenience to the public:<br />
i. The contractor shall not be allowed to dump the empty cable<br />
drums/waste materials <strong>in</strong> Govt/public place, which may cause<br />
<strong>in</strong>convenience to Public. If the contractor does not deposit the empty<br />
cable drum of such material with <strong>in</strong> 3 days of becom<strong>in</strong>g empty, the<br />
BSNL is at liberty to transport all such materials to the store and<br />
amount <strong>in</strong>curred towards transportation will be deducted from his<br />
bill/security deposit.<br />
ii. If such happen<strong>in</strong>g will be done more than two times then the contract<br />
may be term<strong>in</strong>ated. In this regard the decision of DGMM shall be f<strong>in</strong>al<br />
& b<strong>in</strong>d<strong>in</strong>g.<br />
c) Penalty <strong>for</strong> cutt<strong>in</strong>g/damag<strong>in</strong>g the exist<strong>in</strong>g cable of BSNL<br />
While execut<strong>in</strong>g the <strong>works</strong> the contractor shall take utmost care so<br />
that the exist<strong>in</strong>g underground cables are not damaged or cut. In<br />
case any damage /cut is done to the exist<strong>in</strong>g cables of BSNL, a<br />
penalty of Rs. 50,000/- (Rs. Fifty Thousand only) will be charged<br />
from his runn<strong>in</strong>g bills.<br />
Size of exist<strong>in</strong>g UG/ OF cables<br />
cut/damages<br />
Amount of penalty per cut/damage<br />
Upto 100 pairs cable Rs. 500.00 (Five Hundred )<br />
Above 100 pairs & upto 400<br />
pairs<br />
Rs, 1,000.00 (One thousand )<br />
Above 400 pairs Rs. 2,000.00 (Two thousand )<br />
OF <strong>Cable</strong> of any size Rs. 50,000.00 (Fifty thousand )<br />
Besides the above penalty, the contractor shall carry out such repairs<br />
<strong>for</strong> restoration of the damaged cable free of charge. The cost of<br />
jo<strong>in</strong>t<strong>in</strong>g kit shall also be borne by the contractor. If contractor fails to<br />
repair the damage, the cost of repair (<strong>in</strong>clud<strong>in</strong>g cost of labour +<br />
jo<strong>in</strong>t<strong>in</strong>g kit) shall be recovered from the contractor.<br />
d) Penalty <strong>for</strong> damag<strong>in</strong>g any other utilities.<br />
i. If there is a damage caused to any property of a third party or<br />
<strong>in</strong>jury/loss occurs to any person because of lack of proper precaution<br />
on the part of the Contractor, the contractor will be held responsible<br />
28 Signature of Bidder with seal