DGMM-KP/Protective work/<strong>Tender</strong>-08(II)/2012-13<br />

pipel<strong>in</strong>e, Highways, Railways, telephones or poser poles and wires or guy<br />

wires, embankments, cliffs, streams or other obstacles which may physically<br />

or otherwise In any manner, restrict or limit the use of the construction “Right<br />

of User”. Some construction and such cont<strong>in</strong>gency shall be deemed to have<br />

been provid<strong>in</strong>g <strong>for</strong> <strong>in</strong> the rates.<br />

2.4) Quality of work<br />

BSNL shall be the f<strong>in</strong>al judge of the quality of the work and satisfaction of<br />

BSNL <strong>in</strong> respect thereof set <strong>for</strong>th <strong>in</strong> the contract documents. The contractor<br />

shall be and rema<strong>in</strong> responsible <strong>for</strong> complete and proper compliance with<br />

the contract documents and the satisfaction there<strong>in</strong>. The representative of<br />

the DGMM has the right to prohibit the use of men and any tools, materials<br />

and equipment which <strong>in</strong> his op<strong>in</strong>ion do not produce work or per<strong>for</strong>mance<br />

meet<strong>in</strong>g the requirement of the contract documents.<br />

2.5) Taxes and duties<br />

Contractor shall pay all rates, levies, fees, royalties, taxes and duties<br />

payable or aris<strong>in</strong>g out of, by virtue of or <strong>in</strong> connection with and /or <strong>in</strong>cidental<br />

to the contract or any other obligations of the parties <strong>in</strong> terms of the contract<br />

documents and /or <strong>in</strong> respect of the <strong>works</strong> or operations or any part thereof<br />

to be per<strong>for</strong>med by the contractor and the contractor shall <strong>in</strong>demnify and<br />

keep <strong>in</strong>demnified BSNL from and aga<strong>in</strong>st the same or any default by the<br />

contractor <strong>in</strong> the payment thereof.<br />

2.6) PROTECTION OF LIFE ,PROPERTY AND EXISTING FACILITIES<br />

a. The contractor is fully responsible <strong>for</strong> tak<strong>in</strong>g all possible safety precaution<br />

dur<strong>in</strong>g preparation <strong>for</strong> and actual per<strong>for</strong>mance of the <strong>works</strong> and <strong>for</strong> keep<strong>in</strong>g<br />

the work site <strong>in</strong> a reasonable safe condition. The contractor shall protect all<br />

life and property from damage or losses result<strong>in</strong>g from his construction<br />

operations and shall m<strong>in</strong>imize the disturbance and <strong>in</strong>convenience to the<br />

public.<br />

b. If the HDD/open trench work alters the contours of the ground around the<br />

road and highway cross<strong>in</strong>g, <strong>in</strong> such locations, dangerous to traffic, the<br />

contractor shall at his own cost, take all necessary precautions to protect<br />

public and shall comply with all BSNL regulations as to plac<strong>in</strong>g of warn<strong>in</strong>g<br />

boards (M<strong>in</strong>imum size 3 ft. X 2 ft. ) , traffic signals, barricades, flags etc., at<br />

such location. If the contractor does not put the warn<strong>in</strong>g signal as per above<br />

directions, then a penalty of Rs.5000/- per day shall be levied on the<br />

contractor, till the directions are complied by the contractor. The contractor<br />

shall take due precautions to avoid damages to other pipe l<strong>in</strong>es, water<br />

ma<strong>in</strong>s, sewers, telephones, telegraphs and power conduits, laid wires piles<br />

and guy wires, railways, highways, bridges or other underground or above<br />

ground structure and / or property cross<strong>in</strong>g or adjacent to the HDD/open<br />

trench work be<strong>in</strong>g done.<br />

c. Attention of the contractor is drawn to the rules regard<strong>in</strong>g HDD/open trench<br />

work at road cross<strong>in</strong>g, along Railway Bridges, Highways safety precautions<br />

while work<strong>in</strong>g <strong>in</strong> Public Street. The contractor <strong>in</strong> writ<strong>in</strong>g shall obta<strong>in</strong> the<br />

detailed eng<strong>in</strong>eer<strong>in</strong>g <strong>in</strong>structions from the Divisional Eng<strong>in</strong>eer of the area.<br />

d. The contractor shall be solely responsible <strong>for</strong> location of exist<strong>in</strong>g structure<br />

(through approved non-destructive means) and ensur<strong>in</strong>g the safety of all<br />

exist<strong>in</strong>g underground pipel<strong>in</strong>e, electrical cables and / or other structures.<br />